Differences between revisions 3 and 37 (spanning 34 versions)
Revision 3 as of 2010-08-07 00:41:56
Size: 454
Comment:
Revision 37 as of 2010-08-20 16:09:03
Size: 910
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
== * Overview of the underground labyrinth == == Overview of the underground labyrinth ==
 . [[attachment:Rabyrinth_100806.png|{{attachment:Rabyrinth_100806.png|alt text|width=750}}]]
Line 4: Line 5:
== * Detailed view of each experimental hall ==
 [[attachment:CenterRoom_100806.png]]
[[attachment:EndRoom_100806.png]]
[[attachment:Tunnel_100806.png]]
== Detailed view of each experimental hall ==
=== Center room ===
 .
[[attachment:CenterRoom_100806.png]]   . Layout planned by each sub-groups
  .
[[attachment:Laser_Room_100813.pdf|laser group]]
  .
[[attachment:layout100812.pdf|vacuum group]]
  . IFO group
Line 9: Line 13:
== * Life lines ==
 * AC Power Supply
=== End rooms ===
 . [[attachment:EndRoom_100806.png]]
Line 12: Line 16:
=== Tunnel ===
 . [[attachment:Tunnel_100806.png]]
 . [[attachment:Tunnel_Ry_100818.pdf]]
 . [[attachment:tunnel4_4_100818.mcd.pdf]]

== Life lines ==
 * [[PowerSupply|AC Power Supply]]
Line 14: Line 25:
 * Network

 - TCP/IP network

 - For Digital Control

 - GPS and timing system
 * Network 
  * TCP/IP network 
  * For Digital Control 
  * GPS and timing system
Line 25: Line 32:
== * ==
== * ==
== * Cleanliness ==
== Security & Administration ==

== Cleanliness ==
 * Air intake from out-of-mine

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life lines

  • AC Power Supply

  • Water for cooling
  • Network
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

  • Air intake from out-of-mine

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)