Differences between revisions 46 and 52 (spanning 6 versions)
Revision 46 as of 2010-11-18 09:00:23
Size: 1159
Comment:
Revision 52 as of 2010-12-02 00:16:34
Size: 1373
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * Network  * Network [Miyoki]
Line 36: Line 36:
 * Air intake from out-of-mine
 *
[[attachment:air.pdf|Air ventilation estimation (in Japanese)]]
 * Air intake from out-of-mine [Uchiyama]
 *
[[attachment:air.pdf|Air ventilation estimation (in Japanese)]]

== Air Conditioning ==
 * [[attachment:humidity_control.pdf|Requirements of humidity]]
 * Basic Plan [Tatsumi]
Line 40: Line 44:
 * GPS antenna location selection (in Japanese)  * GPS antenna location [Tatsumi, Aso]
   . [[attachment:GPS_antenna_requirements.pdf|S
election of candidates]] (in Japanese)

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Water for cooling
  • Network [Miyoki]
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)