Differences between revisions 48 and 50 (spanning 2 versions)
Revision 48 as of 2010-11-18 09:23:26
Size: 1217
Comment:
Revision 50 as of 2010-11-18 13:38:55
Size: 1278
Comment:
Deletions are marked like this. Additions are marked like this.
Line 37: Line 37:
 *  [[attachment:air.pdf|Air ventilation estimation (in Japanese)]]  * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]]

== Air Conditioning ==
 * Requirements of humidity
Line 40: Line 43:
 * GPS antenna location [[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)  * GPS antenna location     . [[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Water for cooling
  • Network
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

  • Requirements of humidity

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)