Differences between revisions 48 and 54 (spanning 6 versions)
Revision 48 as of 2010-11-18 09:23:26
Size: 1217
Comment:
Revision 54 as of 2010-12-02 00:19:05
Size: 1374
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:
 * Water for cooling
  . [[attachment:Laser_mio_101012.pdf|Laser]]
 * Cooling Water
  . [[attachment:Laser_mio_101012.pdf|For Laser]]
Line 26: Line 26:
 * Network  * Network [Miyoki]
Line 36: Line 36:
 * Air intake from out-of-mine
 *
[[attachment:air.pdf|Air ventilation estimation (in Japanese)]]
 * Air intake from out-of-mine [Uchiyama]
 *
[[attachment:air.pdf|Air ventilation estimation (in Japanese)]]

== Air Conditioning ==
 * [[attachment:humidity_control.pdf|Requirements for humidity]]
 * Basic Plan [Tatsumi]
Line 40: Line 44:
 * GPS antenna location [[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)  * GPS antenna location [Tatsumi, Aso]
   .
[[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Cooling Water
  • Network [Miyoki]
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)