Size: 1224
Comment:
|
Size: 1278
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 37: | Line 37: |
* [[attachment:air.pdf|Air ventilation estimation (in Japanese)]] | * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]] == Air Conditioning == * Requirements of humidity |
Infrastructure
Overview of the underground labyrinth
Detailed view of each experimental hall
Center room
- Layout planned by each sub-groups
- IFO group
End rooms
Tunnel
Life-lines
- Water for cooling
- Network
- TCP/IP network
- For Digital Control
- GPS and timing system
- Telehone (IP phone??)
Security & Administration
Cleanliness
- Air intake from out-of-mine
Air Conditioning
- Requirements of humidity
GPS antenna
- GPS antenna location
Selection of candidates (in Japanese)
Link to Timing System