Differences between revisions 50 and 51
Revision 50 as of 2010-11-18 13:38:55
Size: 1278
Comment:
Revision 51 as of 2010-11-18 13:39:35
Size: 1315
Comment:
Deletions are marked like this. Additions are marked like this.
Line 40: Line 40:
 * Requirements of humidity  *  [[attachment:humidity_control.pdf|Requirements of humidity]]

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Water for cooling
  • Network
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)