Size: 1373
Comment:
|
Size: 1374
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 40: | Line 40: |
* [[attachment:humidity_control.pdf|Requirements of humidity]] | * [[attachment:humidity_control.pdf|Requirements for humidity]] |
Infrastructure
Overview of the underground labyrinth
Detailed view of each experimental hall
Center room
- Layout planned by each sub-groups
- IFO group
End rooms
Tunnel
Life-lines
- Water for cooling
- Network [Miyoki]
- TCP/IP network
- For Digital Control
- GPS and timing system
- Telehone (IP phone??)
Security & Administration
Cleanliness
- Air intake from out-of-mine [Uchiyama]
Air Conditioning
- Basic Plan [Tatsumi]
GPS antenna
- GPS antenna location [Tatsumi, Aso]
Selection of candidates (in Japanese)
Link to Timing System