== Flow chart ==
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/003/VISworkflow-Overview.png|WorkFlow|width=600}}
Line 5: Line 8:
=== Templates for A ===
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets]]
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets templates for A]]
Line 8: Line 10:
=== A01 ===
 * hoge
=== A01 : Simulation satisfy the requirement? ===
==== Input ====
 * KAGRA requirements
  * Input the design sensitivity (ref. xxx)
  * Input the DAC limit (ref. xxx)
 * Suspension model
  * plant model : rigid body model by SUMCON (ref. xxx)
  * control model : LTI model by Matlab simlink (ref. xxx)
  * noise model : seismic noise, control noise (ref. xxx)

==== Content ====


==== Output ====
 * Transfer function
  * transfer function of the suspension (ref. xxx)
 * Noises
  * requirement for sensor noises (ref. xxx)
  * requirement for actuator noises (ref. xxx)
Line 12: Line 31:
=== Templates for B ===
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11957|Check sheets]]
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11957|Check sheets templates for B]]
Line 15: Line 33:
=== B01 === === B01 : Tower is ready to combine? ===
Line 31: Line 49:
=== B02 === === B02 : Payload is ready to combine? ===
 * Please write
  * aaaa
Line 33: Line 53:
=== B03 === === B03 : Can we measure the TF in air? ===
 * Please write
  * aaaa
Line 35: Line 57:
=== B04 ===


== C: Integration phase ==
=== Templates for C ===
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets]]

=== C01 ===
=== B04 : Can we measure the TF in vacuum? ===
 * Damping time
  * RMS in spectrum (plot)
Line 47: Line 64:
=== C02 === == C: Integration phase ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets templates for C]]
Line 49: Line 67:
=== C01 : Can we control the suspension? ===
 * Noise budget
  * Spectrum (plot)
 * Automation
  * check the guardian transition
Line 50: Line 73:
------




== Check items on Software (Control) ==
=== Healthy check template ===
 * Transfer function (plot)
 * Resonant frequencies (PreQUA)

=== Damping time ===
 * RMS in spectrum (plot)

=== Noise budget ===
 * Spectrum (plot)

=== Guardian ===
=== C02 : Can we ===
 * Please write
  * aaaa

Acceptance Test

Flow chart

WorkFlow

A: Design phase

Check sheets templates for A

A01 : Simulation satisfy the requirement?

Input

  • KAGRA requirements
    • Input the design sensitivity (ref. xxx)
    • Input the DAC limit (ref. xxx)
  • Suspension model
    • plant model : rigid body model by SUMCON (ref. xxx)
    • control model : LTI model by Matlab simlink (ref. xxx)
    • noise model : seismic noise, control noise (ref. xxx)

Content

Output

  • Transfer function
    • transfer function of the suspension (ref. xxx)
  • Noises
    • requirement for sensor noises (ref. xxx)
    • requirement for actuator noises (ref. xxx)

B: Installation phase

Check sheets templates for B

B01 : Tower is ready to combine?

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02 : Payload is ready to combine?

  • Please write
    • aaaa

B03 : Can we measure the TF in air?

  • Please write
    • aaaa

B04 : Can we measure the TF in vacuum?

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)

C: Integration phase

Check sheets templates for C

C01 : Can we control the suspension?

  • Noise budget
    • Spectrum (plot)
  • Automation
    • check the guardian transition

C02 : Can we

  • Please write
    • aaaa