Differences between revisions 15 and 16
Revision 15 as of 2020-09-23 14:46:54
Size: 1458
Editor: KousekiMiyo
Comment:
Revision 16 as of 2020-09-23 14:47:21
Size: 1453
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
{{attachment:VISworkflow-Overview.png text|width=100}} {{attachment:VISworkflow-Overview.png|width=400}}

Acceptance Test

width=400

A: Design phase

Templates for A

Check sheets

A01

  • hoge

B: Installation phase

Templates for B

Check sheets

B01

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02

B03

B04

C: Integration phase

Templates for C

Check sheets

C01

  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)

C02


Check items on Software (Control)

Healthy check template

  • Transfer function (plot)
  • Resonant frequencies (PreQUA)

Damping time

  • RMS in spectrum (plot)

Noise budget

  • Spectrum (plot)

Guardian

KAGRA/Subgroups/VIS/Acceptance Test (last edited 2020-12-04 11:38:31 by KousekiMiyo)