1453
Comment:
|
1531
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
{{attachment:VISworkflow-Overview.png|width=400}} |
== Flow chart == {{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/001/VISworkflow-Overview.png|ALS Configuration|width=700}} |
Contents
Acceptance Test
Flow chart
A: Design phase
Templates for A
A01
- hoge
B: Installation phase
Templates for B
B01
- Cable connection
- Resistance (Ohom)
- Continuity (OK/NO)
- Calibration (LVDT, ACC)
- Calibration (plot, polarity, coefficient)
- Sensor noise (plot)
- Working point and dynamic range with FR, Limit SW
- Range (from -mm to +mm)
- Minimum range (mm)
- Optimal point (mm)
- Limit SW (on/off)
- Tuned frequencies of GAS Filter/IP
- Frequency (TF, actuator efficiency)
- Maximum frequency (Hz)
B02
B03
B04
C: Integration phase
Templates for C
C01
- Healthy check
- Transfer function (plot)
- Resonant frequencies (PreQUA)
C02
Check items on Software (Control)
Healthy check template
- Transfer function (plot)
- Resonant frequencies (PreQUA)
Damping time
- RMS in spectrum (plot)
Noise budget
- Spectrum (plot)