Differences between revisions 23 and 24
Revision 23 as of 2020-09-23 15:35:22
Size: 1471
Editor: KousekiMiyo
Comment:
Revision 24 as of 2020-09-23 15:56:12
Size: 1462
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/001/VISworkflow-Overview.png|ALS Configuration|width=700}} {{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/002/VISworkflow-Overview.png|WorkFlow|width=700}}

Acceptance Test

Flow chart

WorkFlow

A: Design phase

Templates for A

Check sheets

A01

  • hoge

B: Installation phase

Templates for B

Check sheets

B01

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02

B03

B04

C: Integration phase

Templates for C

Check sheets

C01

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)
  • Noise budget
    • Spectrum (plot)

C02


Check items on Software (Control)

Noise budget

  • Spectrum (plot)

Guardian

KAGRA/Subgroups/VIS/Acceptance Test (last edited 2020-12-04 11:38:31 by KousekiMiyo)