Contents
Acceptance Test
Flow chart
A: Design phase
A01
- hoge
B: Installation phase
B01
- Cable connection
- Resistance (Ohom)
- Continuity (OK/NO)
- Calibration (LVDT, ACC)
- Calibration (plot, polarity, coefficient)
- Sensor noise (plot)
- Working point and dynamic range with FR, Limit SW
- Range (from -mm to +mm)
- Minimum range (mm)
- Optimal point (mm)
- Limit SW (on/off)
- Tuned frequencies of GAS Filter/IP
- Frequency (TF, actuator efficiency)
- Maximum frequency (Hz)
B02
B03
B04
C: Integration phase
C01
- Damping time
- RMS in spectrum (plot)
- Healthy check
- Transfer function (plot)
- Resonant frequencies (PreQUA)
- Noise budget
- Spectrum (plot)
C02
Check items on Software (Control)
Noise budget
- Spectrum (plot)