Line 5: Line 5:
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/002/VISworkflow-Overview.png|WorkFlow|width=600}} {{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/003/VISworkflow-Overview.png|WorkFlow|width=600}}
Line 10: Line 10:
=== A01 ===
 * hoge
=== A01 : Could the simulation satisfy the requirement? ===
==== Input ====
 * KAGRA requirements
  * Input the design sensitivity (ref. xxx)
  * Input the DAC limit (ref. xxx)
 * Suspension model
  * plant model : rigid body model by SUMCON (ref. xxx)
  * control model : LTI model by Matlab simlink (ref. xxx)
  * noise model : seismic noise, control noise (ref. xxx)

==== Content ====


==== Output ====
 * Transfer function
  * transfer function of the suspension (ref. xxx)
 * Noises
  * requirement for sensor noises (ref. xxx)
  * requirement for actuator noises (ref. xxx)
Line 16: Line 33:
=== B01 === === B01 : Tower is ready to combine? ===
Line 32: Line 49:
=== B02 === === B02 : Payload is ready to combine? ===
Line 34: Line 51:
  * ----   * aaaa
Line 36: Line 53:
=== B03 === === B03 : The whole suspension is ready ? ===
Line 38: Line 55:
  * ----   * aaaa
Line 40: Line 57:
=== B04 === === B04 : The whole suspension is working in vacuum?===
Line 42: Line 59:
  * ----   * aaaa
Line 47: Line 64:
=== C01 === === C01 : ===
Line 60: Line 77:
  * ----   * aaaa

Acceptance Test

Flow chart

WorkFlow

A: Design phase

Check sheets templates for A

A01 : Could the simulation satisfy the requirement?

Input

  • KAGRA requirements
    • Input the design sensitivity (ref. xxx)
    • Input the DAC limit (ref. xxx)
  • Suspension model
    • plant model : rigid body model by SUMCON (ref. xxx)
    • control model : LTI model by Matlab simlink (ref. xxx)
    • noise model : seismic noise, control noise (ref. xxx)

Content

Output

  • Transfer function
    • transfer function of the suspension (ref. xxx)
  • Noises
    • requirement for sensor noises (ref. xxx)
    • requirement for actuator noises (ref. xxx)

B: Installation phase

Check sheets templates for B

B01 : Tower is ready to combine?

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02 : Payload is ready to combine?

  • Please write
    • aaaa

B03 : The whole suspension is ready ?

  • Please write
    • aaaa

=== B04 : The whole suspension is working in vacuum?===

  • Please write
    • aaaa

C: Integration phase

Check sheets templates for C

C01 :

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)
  • Noise budget
    • Spectrum (plot)
  • Automation
    • check the guardian transition

C02

  • Please write
    • aaaa