Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/002/VISworkflow-Overview.png|WorkFlow|width=600}} | {{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/003/VISworkflow-Overview.png|WorkFlow|width=600}} |
Line 10: | Line 10: |
=== A01 === * hoge |
=== A01 : Could the simulation satisfy the requirement? === ==== Input ==== * KAGRA requirements * Input the design sensitivity (ref. xxx) * Input the DAC limit (ref. xxx) * Suspension model * plant model : rigid body model by SUMCON (ref. xxx) * control model : LTI model by Matlab simlink (ref. xxx) * noise model : seismic noise, control noise (ref. xxx) ==== Content ==== ==== Output ==== * Transfer function * transfer function of the suspension (ref. xxx) * Noises * requirement for sensor noises (ref. xxx) * requirement for actuator noises (ref. xxx) |
Line 16: | Line 33: |
=== B01 === | === B01 : Tower is ready to combine? === |
Line 32: | Line 49: |
=== B02 === | === B02 : Payload is ready to combine? === |
Line 34: | Line 51: |
* ---- | * aaaa |
Line 36: | Line 53: |
=== B03 === | === B03 : The whole suspension is ready ? === |
Line 38: | Line 55: |
* ---- | * aaaa |
Line 40: | Line 57: |
=== B04 === | === B04 : The whole suspension is working in vacuum?=== |
Line 42: | Line 59: |
* ---- | * aaaa |
Line 47: | Line 64: |
=== C01 === | === C01 : === |
Line 60: | Line 77: |
* ---- | * aaaa |
Contents
Acceptance Test
Flow chart
A: Design phase
A01 : Could the simulation satisfy the requirement?
Input
- KAGRA requirements
- Input the design sensitivity (ref. xxx)
- Input the DAC limit (ref. xxx)
- Suspension model
- plant model : rigid body model by SUMCON (ref. xxx)
- control model : LTI model by Matlab simlink (ref. xxx)
- noise model : seismic noise, control noise (ref. xxx)
Content
Output
- Transfer function
- transfer function of the suspension (ref. xxx)
- Noises
- requirement for sensor noises (ref. xxx)
- requirement for actuator noises (ref. xxx)
B: Installation phase
B01 : Tower is ready to combine?
- Cable connection
- Resistance (Ohom)
- Continuity (OK/NO)
- Calibration (LVDT, ACC)
- Calibration (plot, polarity, coefficient)
- Sensor noise (plot)
- Working point and dynamic range with FR, Limit SW
- Range (from -mm to +mm)
- Minimum range (mm)
- Optimal point (mm)
- Limit SW (on/off)
- Tuned frequencies of GAS Filter/IP
- Frequency (TF, actuator efficiency)
- Maximum frequency (Hz)
B02 : Payload is ready to combine?
- Please write
- aaaa
B03 : The whole suspension is ready ?
- Please write
- aaaa
=== B04 : The whole suspension is working in vacuum?===
- Please write
- aaaa
C: Integration phase
C01 :
- Damping time
- RMS in spectrum (plot)
- Healthy check
- Transfer function (plot)
- Resonant frequencies (PreQUA)
- Noise budget
- Spectrum (plot)
- Automation
- check the guardian transition
C02
- Please write
- aaaa