Differences between revisions 30 and 31
Revision 30 as of 2020-09-23 16:02:52
Size: 1464
Editor: KousekiMiyo
Comment:
Revision 31 as of 2020-09-23 16:28:45
Size: 1464
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/002/VISworkflow-Overview.png|WorkFlow|width=600}} {{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/003/VISworkflow-Overview.png|WorkFlow|width=600}}

Acceptance Test

Flow chart

WorkFlow

A: Design phase

Check sheets templates for A

A01

  • hoge

B: Installation phase

Check sheets templates for B

B01

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02

  • Please write
    • aaaa

B03

  • Please write
    • aaaa

B04

  • Please write
    • aaaa

C: Integration phase

Check sheets templates for C

C01

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)
  • Noise budget
    • Spectrum (plot)
  • Automation
    • check the guardian transition

C02

  • Please write
    • aaaa

KAGRA/Subgroups/VIS/Acceptance Test (last edited 2020-12-04 11:38:31 by KousekiMiyo)