Line 5: Line 5:
{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/002/VISworkflow-Overview.png|WorkFlow|width=600}} [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12025| Flow chart for the acceptance check ]]

Line 10: Line 12:
=== A01 ===
 * hoge
=== A01 : Simulation satisfy the requirement? ===
 * {i} Please write
Line 16: Line 19:
=== B01 === === B01 : Tower is ready to combine? ===
Line 32: Line 35:
=== B02 ===
 * Please write
  * aaaa
=== B02 : Payload is ready to combine? ===
 * {i} Please write
Line 36: Line 38:
=== B03 ===
 * Please write
  * aaaa
=== B03 : Can we measure the TF in air? ===
 * {i} Please write
Line 40: Line 41:
=== B04 ===
 * Please write
  * aaaa

== C: Integration phase ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets templates for C]]

=== C01 ===
=== B04 : Can we measure the TF in vacuum? ===
Line 53: Line 47:

== C: Integration phase ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets templates for C]]

=== C01 : Can we control the suspension in local? ===
Line 58: Line 57:
=== C02 === === C02 : Can we control the suspension in global? ===

Acceptance Test

Flow chart

Flow chart for the acceptance check

A: Design phase

Check sheets templates for A

A01 : Simulation satisfy the requirement?

  • {i} Please write

B: Installation phase

Check sheets templates for B

B01 : Tower is ready to combine?

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02 : Payload is ready to combine?

  • {i} Please write

B03 : Can we measure the TF in air?

  • {i} Please write

B04 : Can we measure the TF in vacuum?

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)

C: Integration phase

Check sheets templates for C

C01 : Can we control the suspension in local?

  • Noise budget
    • Spectrum (plot)
  • Automation
    • check the guardian transition

C02 : Can we control the suspension in global?

  • Please write
    • aaaa