Differences between revisions 36 and 37
Revision 36 as of 2020-09-23 17:57:02
Size: 2039
Editor: KousekiMiyo
Comment:
Revision 37 as of 2020-09-23 17:57:15
Size: 2036
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * KAGRA requirements
  * Input the design sensitivity (ref. xxx)
  * Input the DAC limit (ref. xxx)
* KAGRA requirements
 * Input the design sensitivity (ref. xxx)
 * Input the DAC limit (ref. xxx)

Acceptance Test

Flow chart

WorkFlow

A: Design phase

Check sheets templates for A

A01 : Could the simulation satisfy the requirement?

Input

* KAGRA requirements

  • Input the design sensitivity (ref. xxx)
  • Input the DAC limit (ref. xxx)

* Suspension model

  • plant model : rigid body model by SUMCON (ref. xxx)
  • control model : LTI model by Matlab simlink (ref. xxx)
  • noise model : seismic noise, control noise (ref. xxx)

Content

Output

  • Transfer function
    • transfer function of the suspension (ref. xxx)
  • Noises
    • requirement for sensor noises (ref. xxx)
    • requirement for actuator noises (ref. xxx)

B: Installation phase

Check sheets templates for B

B01

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02

  • Please write
    • aaaa

B03

  • Please write
    • aaaa

B04

  • Please write
    • aaaa

C: Integration phase

Check sheets templates for C

C01

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)
  • Noise budget
    • Spectrum (plot)
  • Automation
    • check the guardian transition

C02

  • Please write
    • aaaa

KAGRA/Subgroups/VIS/Acceptance Test (last edited 2020-12-04 11:38:31 by KousekiMiyo)