Acceptance Test
Flow chart
Flow chart for the acceptance check
A: Design phase
A01 : Simulation satisfy the requirement?
Please write
B: Installation phase
B01 : Tower is ready to combine?
- Cable connection
- Resistance (Ohom)
- Continuity (OK/NO)
- Calibration (LVDT, ACC)
- Calibration (plot, polarity, coefficient)
- Sensor noise (plot)
- Working point and dynamic range with FR, Limit SW
- Range (from -mm to +mm)
- Minimum range (mm)
- Optimal point (mm)
- Limit SW (on/off)
- Tuned frequencies of GAS Filter/IP
- Frequency (TF, actuator efficiency)
- Maximum frequency (Hz)
B02 : Payload is ready to combine?
Please write
B03 : Can we measure the TF in air?
Please write
B04 : Can we measure the TF in vacuum?
- Damping time
- RMS in spectrum (plot)
- Healthy check
- Transfer function (plot)
- Resonant frequencies (PreQUA)
C: Integration phase
C01 : Can we control the suspension in local?
- Noise budget
- Spectrum (plot)
- Automation
- check the guardian transition
C02 : Can we control the suspension in global?
- Please write
- aaaa