Differences between revisions 9 and 48 (spanning 39 versions)
Revision 9 as of 2020-09-23 14:30:56
Size: 1027
Editor: KousekiMiyo
Comment:
Revision 48 as of 2020-09-24 18:24:48
Size: 1811
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
== Flow chart ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12025| Flow chart for the acceptance check ]]

{{https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0120/E2012025/004/VISworkflow.png|WorkFlow|width=600}}
Line 5: Line 10:
=== A01 ===
 * hoge
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets templates for A]]

=== A01 : Simulation satisfy the requirement? ===
 * {i} Please write
Line 9: Line 17:
=== B01 === [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11957|Check sheets templates for B]]

=== B01 : Tower is ready to combine? ===
Line 25: Line 35:
=== B02 : Payload is ready to combine? ===
 * {i} Please write

=== B03 : Can we measure the TF in air? ===
 * {i} Please write

=== B04 : Can we measure the TF in vacuum? ===
 * Damping time
  * RMS in spectrum (plot)
 * Healthy check
  * Transfer function (plot)
  * Resonant frequencies (PreQUA)
Line 26: Line 49:
=== C01 === [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxx|Check sheets templates for C]]
Line 28: Line 51:
=== C02 === === C01 : Can we control the suspension in local? ===
 * Noise budget
  * Spectrum (plot)
 * Automation
  * check the guardian transition
Line 30: Line 57:



------

== Check items on Hardware ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11957|Check sheet]]



== Check items on Software (Control) ==
=== Healthy check template ===
 * Transfer function (plot)
 * Resonant frequencies (PreQUA)

=== Damping time ===
 * RMS in spectrum (plot)

=== Noise budget ===
 * Spectrum (plot)

=== Guardian ===
=== C02 : Can we control the suspension in global? ===
 * Please write
  * aaaa

Acceptance Test

Flow chart

Flow chart for the acceptance check

WorkFlow

A: Design phase

Check sheets templates for A

A01 : Simulation satisfy the requirement?

  • {i} Please write

B: Installation phase

Check sheets templates for B

B01 : Tower is ready to combine?

  • Cable connection
    • Resistance (Ohom)
    • Continuity (OK/NO)
  • Calibration (LVDT, ACC)
    • Calibration (plot, polarity, coefficient)
    • Sensor noise (plot)
  • Working point and dynamic range with FR, Limit SW
    • Range (from -mm to +mm)
    • Minimum range (mm)
    • Optimal point (mm)
    • Limit SW (on/off)
  • Tuned frequencies of GAS Filter/IP
    • Frequency (TF, actuator efficiency)
    • Maximum frequency (Hz)

B02 : Payload is ready to combine?

  • {i} Please write

B03 : Can we measure the TF in air?

  • {i} Please write

B04 : Can we measure the TF in vacuum?

  • Damping time
    • RMS in spectrum (plot)
  • Healthy check
    • Transfer function (plot)
    • Resonant frequencies (PreQUA)

C: Integration phase

Check sheets templates for C

C01 : Can we control the suspension in local?

  • Noise budget
    • Spectrum (plot)
  • Automation
    • check the guardian transition

C02 : Can we control the suspension in global?

  • Please write
    • aaaa

KAGRA/Subgroups/VIS/Acceptance Test (last edited 2020-12-04 11:38:31 by KousekiMiyo)