Line 6: | Line 6: |
. '''Next Meeting: 21 May, 2014''' | . '''Next Meeting: 5 June?, 2014 (TBC)''' |
Line 9: | Line 9: |
=== 2014.6.4 === . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|Minute(TBA)]] . 1) Status of payload assembly. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 2) Preparation of TAMA suspension and stack. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 3) Fishing rod design for KAGRA GAS filters. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2449|File]] === 2014.5.21 === . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2448|Minute]] . 1) Status of payload design and assembly. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 2) Report about OSEM measurement. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 3) Brief reports, status of Type-C procurement. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] |
|
Line 10: | Line 23: |
. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|Minute]] | . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2433|Minute]] |
Line 13: | Line 26: |
. 3) Simulation on coil driver circuits. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2400|File(TBA)]] | . 3) Simulation on coil driver circuits. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2400|File]] |
NAOJ VIS Meeting
- Every Wednesday, from 15:00 (JST)
Next Meeting: 5 June?, 2014 (TBC)
2014.6.4
1) Status of payload assembly. File(TBA)
2) Preparation of TAMA suspension and stack. File(TBA)
3) Fishing rod design for KAGRA GAS filters. File
2014.5.21
1) Status of payload design and assembly. File(TBA)
2) Report about OSEM measurement. File(TBA)
3) Brief reports, status of Type-C procurement. File(TBA)
2014.5.14
1) Status of payload design and prototype assembly. File(TBA)
2) Brief reports, status of Type-C procurement. File
3) Simulation on coil driver circuits. File
2014.5.7
1) Status of payload prototype assembly. File(TBA)
2) Measurement on OSEM. File
3) Weight distribution problem on the payload. File(TBA)
4) Vacuum system setup in TAMA west end. Blog
2014.4.30
1) Status of payload prototype assembly. File
2) Measurement on OSEM. File
3) Weight distribution problem on the payload. File
4) Report on G&M and NIKHEF. File
2014.4.23
1) Status of payload assembly in the 20m Lab. File(TBA)
2) Weight distribution problem on the payload. File