Differences between revisions 15 and 16
Revision 15 as of 2014-06-04 18:39:32
Size: 3582
Comment:
Revision 16 as of 2014-06-16 21:33:19
Size: 3726
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 . '''Next Meeting: 5 June?, 2014 (TBC)'''  . '''Next Meeting: 18 June, 2014'''
Line 9: Line 9:
=== 2014.6.11 ===
 . 1) Assembly of the payload in the 20m Lab.
 . 2) Calibration of OSEMs.
 . 3) Preparation of TAMA suspension.
 . 4) MISC

NAOJ VIS Meeting

  • Every Wednesday, from 15:00 (JST)
  • Next Meeting: 18 June, 2014


2014.6.11

  • 1) Assembly of the payload in the 20m Lab.
  • 2) Calibration of OSEMs.
  • 3) Preparation of TAMA suspension.
  • 4) MISC

2014.6.4

2014.5.21

2014.5.14

  • Minute

  • 1) Status of payload design and prototype assembly. File(TBA)

  • 2) Brief reports, status of Type-C procurement. File

  • 3) Simulation on coil driver circuits. File

2014.5.7

  • Minute

  • 1) Status of payload prototype assembly. File(TBA)

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File(TBA)

  • 4) Vacuum system setup in TAMA west end. Blog

2014.4.30

  • Minute

  • 1) Status of payload prototype assembly. File

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File

  • 4) Report on G&M and NIKHEF. File

2014.4.23

  • 1) Status of payload assembly in the 20m Lab. File(TBA)

  • 2) Weight distribution problem on the payload. File

2014.4.9

KAGRA/Subgroups/VIS/MeetingNAOJ (last edited 2021-07-21 08:59:45 by KousekiMiyo)