1320
Comment:
|
2536
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
. '''Next Meeting: 7 May, 2014''' | . '''Next Meeting: 14 May, 2014''' ---- === 2014.5.14 === . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|Minute]] . 1) Status of payload design and prototype assembly. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 2) Brief reports, status of Type-C procurement. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2395|File]] . 3) Simulation on coil driver circuits. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] === 2014.5.7 === . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2391|Minute]] . 1) Status of payload prototype assembly. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 2) Measurement on OSEM. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 3) Weight distribution problem on the payload. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|File(TBA)]] . 4) Vacuum system setup in TAMA west end. [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/vibrationisolation/2014/05/connecting-bellows-and-vacuum-chamber.html|Blog]] |
Line 9: | Line 23: |
. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=XXXX|Minute(TBA)]] | . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2392|Minute]] |
Line 12: | Line 26: |
. 3) Weight distribution problem on the payload. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2371|File(TBA)]] | . 3) Weight distribution problem on the payload. [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2371|File]] |
NAOJ VIS Meeting
- Every Wednesday, from 15:00 (JST)
Next Meeting: 14 May, 2014
2014.5.14
1) Status of payload design and prototype assembly. File(TBA)
2) Brief reports, status of Type-C procurement. File
3) Simulation on coil driver circuits. File(TBA)
2014.5.7
1) Status of payload prototype assembly. File(TBA)
2) Measurement on OSEM. File(TBA)
3) Weight distribution problem on the payload. File(TBA)
4) Vacuum system setup in TAMA west end. Blog
2014.4.30
1) Status of payload prototype assembly. File
2) Measurement on OSEM. File(TBA)
3) Weight distribution problem on the payload. File
4) Report on G&M and NIKHEF. File
2014.4.23
1) Status of payload assembly in the 20m Lab. File(TBA)
2) Weight distribution problem on the payload. File