Differences between revisions 43 and 44
Revision 43 as of 2015-03-17 23:38:46
Size: 6892
Comment:
Revision 44 as of 2015-04-01 10:44:52
Size: 7005
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 . '''Next Meeting: 25 March, 2015'''  . '''Next Meeting: 8 April, 2015'''
Line 9: Line 9:
=== 2015.3.25 ===
 . [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3454|Minute]]

NAOJ VIS Meeting

  • Every Wednesday, from 15:00 (JST)
  • Next Meeting: 8 April, 2015


2015.3.25

2015.3.11

2015.3.4

2015.2.25

2015.2.4

2015.1.28

2015.1.14

2015.1.7

2014.12.24

2014.12.17

2014.12.10

2014.12.3

2014.11.26

2014.11.19

2014.11.5

2014.10.8

2014.9.24

2014.9.17

2014.8.27

2014.8.20

2014.8.13

2014.8.6

2014.7.24

2014.7.16

2014.7.9

2014.7.2

2014.6.25

2014.6.18

2014.6.11

  • Minute

  • 1) Assembly of the payload in the 20m Lab.
  • 2) Calibration of OSEMs.
  • 3) Preparation of TAMA suspension.
  • 4) MISC

2014.6.4

  • Minute

  • 1) Status of payload assembly. File(TBA)

  • 2) Preparation of TAMA suspension and stack. File(TBA)

  • 3) Fishing rod design for KAGRA GAS filters. File

2014.5.21

2014.5.14

  • Minute

  • 1) Status of payload design and prototype assembly. File(TBA)

  • 2) Brief reports, status of Type-C procurement. File

  • 3) Simulation on coil driver circuits. File

2014.5.7

  • Minute

  • 1) Status of payload prototype assembly. File(TBA)

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File(TBA)

  • 4) Vacuum system setup in TAMA west end. Blog

2014.4.30

  • Minute

  • 1) Status of payload prototype assembly. File

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File

  • 4) Report on G&M and NIKHEF. File

2014.4.23

  • 1) Status of payload assembly in the 20m Lab. File(TBA)

  • 2) Weight distribution problem on the payload. File

2014.4.9

KAGRA/Subgroups/VIS/MeetingNAOJ (last edited 2021-07-21 08:59:45 by KousekiMiyo)