NAOJ VIS Meeting

  • Every Wednesday, from 15:00 (JST)
  • Next Meeting: 14 May, 2014


2014.5.14

  • Minute

  • 1) Status of payload design and prototype assembly. File(TBA)

  • 2) Brief reports, status of Type-C procurement. File

  • 3) Simulation on coil driver circuits. File(TBA)

2014.5.7

  • Minute

  • 1) Status of payload prototype assembly. File(TBA)

  • 2) Measurement on OSEM. File(TBA)

  • 3) Weight distribution problem on the payload. File(TBA)

  • 4) Vacuum system setup in TAMA west end. Blog

2014.4.30

  • Minute

  • 1) Status of payload prototype assembly. File

  • 2) Measurement on OSEM. File(TBA)

  • 3) Weight distribution problem on the payload. File

  • 4) Report on G&M and NIKHEF. File

2014.4.23

  • 1) Status of payload assembly in the 20m Lab. File(TBA)

  • 2) Weight distribution problem on the payload. File

2014.4.9