Line 1: Line 1:
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|]] == Project ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Schedule of VIS after O3]]

[[https://github.com/gw-vis/userapps/issues|Github Issues]]

== Sprint ==
=== 09/28 - 10/09 ===
Holiday:
 *


=== 09/14 - 09/25 ===
Scope:
Holiday: 09/21,09/22
 * Done [[https://github.com/gw-vis/userapps/issues/49|#49]]: Make the new directory structure to avoid messy workspace.
 * Done [[https://github.com/gw-vis/userapps/issues/53|#53]]: same as #49. Duplicated issue.
 * Done [[https://github.com/gw-vis/userapps/issues/11|#11]]: We decided not to divide the VIS RT-model into the tower and payload part towards O4.
 * Done [[https://github.com/gw-vis/userapps/issues/16|#16]]: Made the test point for CAL to inject the excitation signal to the VIS suspensions.
 * Done [[https://github.com/gw-vis/userapps/issues/23|#23]]: Made VIS_OVERVIEW.adl
 * Done [[https://github.com/gw-vis/userapps/issues/12|#12]]: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.
 * Done [[https://github.com/gw-vis/userapps/issues/142|#142]]: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.
 * Done [[https://github.com/gw-vis/userapps/issues/xx|#xx]]:
 * Done [[https://github.com/gw-vis/userapps/issues/xx|#xx]]:

Project

Schedule of VIS after O3

Github Issues

Sprint

09/28 - 10/09

Holiday:

09/14 - 09/25

Scope: Holiday: 09/21,09/22

  • Done #49: Make the new directory structure to avoid messy workspace.

  • Done #53: same as #49. Duplicated issue.

  • Done #11: We decided not to divide the VIS RT-model into the tower and payload part towards O4.

  • Done #16: Made the test point for CAL to inject the excitation signal to the VIS suspensions.

  • Done #23: Made VIS_OVERVIEW.adl

  • Done #12: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.

  • Done #142: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.

  • Done #xx:

  • Done #xx: