[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|]] | == Project == [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Schedule of VIS after O3]] [[https://github.com/gw-vis/userapps/issues|Github Issues]] == Sprint == === Sprint03: 10/12 - 10/23 === Power outage in 10/14 * Done [[https://github.com/gw-vis/userapps/issues/160|#160]]: Fabian wrote procedure document for the venting. * Done [[https://github.com/gw-vis/userapps/issues/xx|#xx]]: === Sprint02: 09/28 - 10/09 === Holiday: * Done [[https://github.com/gw-vis/userapps/issues/110|#110]]: Ikeda-san prepared the EPICS channel for limit switches * Done [[https://github.com/gw-vis/userapps/issues/166|#166]]: Ikeda-san ordered some temperature controller for prototype. It will deliver in 12/16. * Done [[https://github.com/gw-vis/userapps/issues/164|#164]]: Ikeda-san prepare the EPICS channel to know the position of the limit switch. * Done [[https://github.com/gw-vis/pcas-controller/issues/3|#003]]: Ikeda-san fix the bug that the script stop randomly. === Sprint01: 09/14 - 09/25 === Holiday: 09/21,09/22 * Done [[https://github.com/gw-vis/userapps/issues/49|#49]]: Make the new directory structure to avoid messy workspace. * Done [[https://github.com/gw-vis/userapps/issues/53|#53]]: same as #49. Duplicated issue. * Done [[https://github.com/gw-vis/userapps/issues/11|#11]]: We decided not to divide the VIS RT-model into the tower and payload part towards O4. * Done [[https://github.com/gw-vis/userapps/issues/16|#16]]: Made the test point for CAL to inject the excitation signal to the VIS suspensions. * Done [[https://github.com/gw-vis/userapps/issues/23|#23]]: Made VIS_OVERVIEW.adl * Done [[https://github.com/gw-vis/userapps/issues/12|#12]]: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm. * Done [[https://github.com/gw-vis/userapps/issues/142|#142]]: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san. * Done [[https://github.com/gw-vis/userapps/issues/125|#125]]: Sato-san checked the direction of rotation for the stepper motor. * Done [[https://github.com/gw-vis/userapps/issues/141|#141]]: Make new repository named 'pcas-controller' for stepper motor. I hope this repository will integrate all controllers in KAGRA, e.g. picomotor, half wave plate, and function generator. |
Project
Sprint
Sprint03: 10/12 - 10/23
Power outage in 10/14
Sprint02: 09/28 - 10/09
Holiday:
Done #110: Ikeda-san prepared the EPICS channel for limit switches
Done #166: Ikeda-san ordered some temperature controller for prototype. It will deliver in 12/16.
Done #164: Ikeda-san prepare the EPICS channel to know the position of the limit switch.
Done #003: Ikeda-san fix the bug that the script stop randomly.
Sprint01: 09/14 - 09/25
Holiday: 09/21,09/22
Done #49: Make the new directory structure to avoid messy workspace.
Done #53: same as #49. Duplicated issue.
Done #11: We decided not to divide the VIS RT-model into the tower and payload part towards O4.
Done #16: Made the test point for CAL to inject the excitation signal to the VIS suspensions.
Done #23: Made VIS_OVERVIEW.adl
Done #12: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.
Done #142: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.
Done #125: Sato-san checked the direction of rotation for the stepper motor.
Done #141: Make new repository named 'pcas-controller' for stepper motor. I hope this repository will integrate all controllers in KAGRA, e.g. picomotor, half wave plate, and function generator.