Differences between revisions 1 and 35 (spanning 34 versions)
Revision 1 as of 2020-04-30 12:51:09
Size: 86
Editor: KousekiMiyo
Comment:
Revision 35 as of 2021-01-15 15:51:35
Size: 4783
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|]] <<TableOfContents(3)>>

== Project ==
[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Schedule of VIS after O3]]

[[https://github.com/gw-vis/userapps/issues|Github Issues]]

== Sprint ==

=== Sprint09: 01/11 - 01/22 ===
'''Schedule'''

'''Closed issues'''


=== Sprint08: 12/28 - 01/08 ===
'''Schedule'''

'''Closed issues'''


=== Sprint08: 12/18 - 12/25 ===
'''Schedule'''

'''Closed issues'''


=== Sprint07: 12/07 - 12/18 ===
'''Schedule'''

'''Closed issues'''

=== Sprint06: 11/23 - 12/04 ===
'''Schedule'''

'''Closed issues'''
 * Done [[https://github.com/gw-vis/userapps/issues/182|#182]]: Ikeda-san tried to make a way to know whether the FR touching on structure by reading the motor torque, but he conclude that it is difficult to know easily.
 * Done [[https://github.com/gw-vis/userapps/issues/196|#196]]: Offload work during IYC evacuation was done.

=== Sprint05: 11/09 - 11/20 ===
'''Schedule'''

'''Closed issues'''


=== Sprint04: 10/16 - 11/06 ===
'''Schedule'''

'''Closed issues'''
 * Done [[https://github.com/gw-vis/userapps/issues/162|#162]]: Sato-san and Ikeda-san made a manual for installation of the limit switches. The document is [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|here]].
 * Done [[https://github.com/gw-vis/userapps/issues/162|#162]]: Ikeda-san made the mini overview medm screen for the offload to know that status quickly.
 * Done [[https://github.com/gw-vis/userapps/issues/190|#190]]: Disconnect the cryopayload of EY.
 * Done [[https://github.com/gw-vis/userapps/issues/186|#186]]: Ikeda-san made a button to start and stop the stepper script from OFFLOAD_OVERVIEW.adl.
 * Done [[https://github.com/gw-vis/userapps/issues/176|#176]]: I finished to draw the pictures for suspensions in [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12144|here]]
 * Done [[https://github.com/gw-vis/userapps/issues/163|#163]]: We don't do the test because we use the limit switch as a sensor to know the limit range of the stepper motor. so we don't touch the motor to the switch frequently.

=== Sprint03: 10/12 - 10/23 ===
'''Schedule'''
 * Power outage in 10/14

'''Closed issues'''
 * Done [[https://github.com/gw-vis/userapps/issues/160|#160]]: Fabian wrote procedure document for the venting.
 * Done [[https://github.com/gw-vis/userapps/issues/151|#151]]: Gathered the pin assignment information of Type-A
 * Done [[https://github.com/gw-vis/userapps/issues/178|#178]]: We made the OFFLOAD_OVERVIEW.adl.
 * Done [[https://github.com/gw-vis/userapps/issues/xx|#xx]]:


=== Sprint02: 09/28 - 10/09 ===
'''Schedule:'''
 * None

'''Closed issues'''
 * Done [[https://github.com/gw-vis/userapps/issues/110|#110]]: Ikeda-san prepared the EPICS channel for limit switches
 * Done [[https://github.com/gw-vis/userapps/issues/166|#166]]: Ikeda-san ordered some temperature controller for prototype. It will deliver in 12/16.
 * Done [[https://github.com/gw-vis/userapps/issues/164|#164]]: Ikeda-san prepare the EPICS channel to know the position of the limit switch.
 * Done [[https://github.com/gw-vis/pcas-controller/issues/3|#003]]: Ikeda-san fix the bug that the script stop randomly.

=== Sprint01: 09/14 - 09/25 ===
'''Holiday''': 09/21,09/22
 * None

'''Closed issues'''
 * Done [[https://github.com/gw-vis/userapps/issues/49|#49]]: Make the new directory structure to avoid messy workspace.
 * Done [[https://github.com/gw-vis/userapps/issues/53|#53]]: same as #49. Duplicated issue.
 * Done [[https://github.com/gw-vis/userapps/issues/11|#11]]: We decided not to divide the VIS RT-model into the tower and payload part towards O4.
 * Done [[https://github.com/gw-vis/userapps/issues/16|#16]]: Made the test point for CAL to inject the excitation signal to the VIS suspensions.
 * Done [[https://github.com/gw-vis/userapps/issues/23|#23]]: Made VIS_OVERVIEW.adl
 * Done [[https://github.com/gw-vis/userapps/issues/12|#12]]: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.
 * Done [[https://github.com/gw-vis/userapps/issues/142|#142]]: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.
 * Done [[https://github.com/gw-vis/userapps/issues/125|#125]]: Sato-san checked the direction of rotation for the stepper motor.
 * Done [[https://github.com/gw-vis/userapps/issues/141|#141]]: Make new repository named 'pcas-controller' for stepper motor. I hope this repository will integrate all controllers in KAGRA, e.g. picomotor, half wave plate, and function generator.

Project

Schedule of VIS after O3

Github Issues

Sprint

Sprint09: 01/11 - 01/22

Schedule

Closed issues

Sprint08: 12/28 - 01/08

Schedule

Closed issues

Sprint08: 12/18 - 12/25

Schedule

Closed issues

Sprint07: 12/07 - 12/18

Schedule

Closed issues

Sprint06: 11/23 - 12/04

Schedule

Closed issues

  • Done #182: Ikeda-san tried to make a way to know whether the FR touching on structure by reading the motor torque, but he conclude that it is difficult to know easily.

  • Done #196: Offload work during IYC evacuation was done.

Sprint05: 11/09 - 11/20

Schedule

Closed issues

Sprint04: 10/16 - 11/06

Schedule

Closed issues

  • Done #162: Sato-san and Ikeda-san made a manual for installation of the limit switches. The document is here.

  • Done #162: Ikeda-san made the mini overview medm screen for the offload to know that status quickly.

  • Done #190: Disconnect the cryopayload of EY.

  • Done #186: Ikeda-san made a button to start and stop the stepper script from OFFLOAD_OVERVIEW.adl.

  • Done #176: I finished to draw the pictures for suspensions in here

  • Done #163: We don't do the test because we use the limit switch as a sensor to know the limit range of the stepper motor. so we don't touch the motor to the switch frequently.

Sprint03: 10/12 - 10/23

Schedule

  • Power outage in 10/14

Closed issues

  • Done #160: Fabian wrote procedure document for the venting.

  • Done #151: Gathered the pin assignment information of Type-A

  • Done #178: We made the OFFLOAD_OVERVIEW.adl.

  • Done #xx:

Sprint02: 09/28 - 10/09

Schedule:

  • None

Closed issues

  • Done #110: Ikeda-san prepared the EPICS channel for limit switches

  • Done #166: Ikeda-san ordered some temperature controller for prototype. It will deliver in 12/16.

  • Done #164: Ikeda-san prepare the EPICS channel to know the position of the limit switch.

  • Done #003: Ikeda-san fix the bug that the script stop randomly.

Sprint01: 09/14 - 09/25

Holiday: 09/21,09/22

  • None

Closed issues

  • Done #49: Make the new directory structure to avoid messy workspace.

  • Done #53: same as #49. Duplicated issue.

  • Done #11: We decided not to divide the VIS RT-model into the tower and payload part towards O4.

  • Done #16: Made the test point for CAL to inject the excitation signal to the VIS suspensions.

  • Done #23: Made VIS_OVERVIEW.adl

  • Done #12: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.

  • Done #142: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.

  • Done #125: Sato-san checked the direction of rotation for the stepper motor.

  • Done #141: Make new repository named 'pcas-controller' for stepper motor. I hope this repository will integrate all controllers in KAGRA, e.g. picomotor, half wave plate, and function generator.

KAGRA/Subgroups/VIS/Schedule (last edited 2021-04-10 08:43:49 by KousekiMiyo)