Line 20: Line 20:
|| ||<-2>'''Installation of'''||<-4>'''Integration in'''||
|| ||'''tower''' ||'''payload''' ||'''Air'''||'''Vacuum'''||'''Vacuum With IFO'''||
||'''ETMX''' ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]] || ||
|| ||'''is installed'''||'''is ready in air'''||'''is ready in vacuum'''||
||'''ETMX''' ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]] || || ||

Schedule

KAGRA

Suspension-wise

People-wise

All

ETMX

Takahashi (Type-A leader)

IFO

ITMX

Fabian (Type-B leader)

CAL

ETMY

Sato

ITMY

Hirata

PRs

Ikeda

BS/SRs

Miyo

Input Optics suspensions

Ushiba (CRY)

Output Optics susspensions

Kimura (CRY/VAC)

Transmitter Suspensions (TRs)

Akutsu (AOS)

Old VIS schedule had been used from 2021/03 is in JGW-L2011475

Milestones

is installed

is ready in air

is ready in vacuum

ETMX