Differences between revisions 108 and 109
Revision 108 as of 2021-03-29 11:31:33
Size: 8305
Editor: KousekiMiyo
Comment:
Revision 109 as of 2021-03-29 11:31:50
Size: 8308
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
||'''ETMX''' ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]] || || ||'''ETMX''' ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]] || || ||

Schedule

KAGRA

Suspension-wise

People-wise

All

ETMX

Takahashi (Type-A leader)

IFO

ITMX

Fabian (Type-B leader)

CAL

ETMY

Sato

ITMY

Hirata

PRs

Ikeda

BS/SRs

Miyo

Input Optics suspensions

Ushiba (CRY)

Output Optics susspensions

Kimura (CRY/VAC)

Transmitter Suspensions (TRs)

Akutsu (AOS)

Old VIS schedule had been used from 2021/03 is in JGW-L2011475

Milestones

is installed

is ready in air

is ready in vacuum

ETMX

#108

KAGRA/Subgroups/VIS/Schedule (last edited 2021-04-10 08:43:49 by KousekiMiyo)