Differences between revisions 12 and 13
Revision 12 as of 2020-09-14 08:53:27
Size: 1315
Editor: KousekiMiyo
Comment:
Revision 13 as of 2020-09-15 18:19:08
Size: 1438
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * Done [[https://github.com/gw-vis/userapps/issues/142|#142]]: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.
Line 23: Line 24:
 * Done [[https://github.com/gw-vis/userapps/issues/xx|#xx]]:

Project

Schedule of VIS after O3

Github Issues

Sprint

09/28 - 10/09

Holiday:

09/14 - 09/25

Scope: Holiday: 09/21,09/22

  • Done #49: Make the new directory structure to avoid messy workspace.

  • Done #53: same as #49. Duplicated issue.

  • Done #11: We decided not to divide the VIS RT-model into the tower and payload part towards O4.

  • Done #16: Made the test point for CAL to inject the excitation signal to the VIS suspensions.

  • Done #23: Made VIS_OVERVIEW.adl

  • Done #12: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.

  • Done #142: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.

  • Done #xx:

  • Done #xx:

KAGRA/Subgroups/VIS/Schedule (last edited 2021-04-10 08:43:49 by KousekiMiyo)