Line 1: Line 1:
<<TableOfContents(3)>>
Line 8: Line 10:
=== Sprint09: 01/11 - 01/22 ===
'''Schedule'''

'''Closed issues'''


=== Sprint08: 12/28 - 01/08 ===
'''Schedule'''

'''Closed issues'''


=== Sprint08: 12/18 - 12/25 ===
'''Schedule'''

'''Closed issues'''


=== Sprint07: 12/07 - 12/18 ===
'''Schedule'''

'''Closed issues'''

=== Sprint06: 11/23 - 12/04 ===
'''Schedule'''

'''Closed issues'''


=== Sprint05: 11/09 - 11/20 ===
'''Schedule'''

'''Closed issues'''


=== Sprint04: 10/16 - 11/06 ===
'''Schedule'''

'''Closed issues'''
Line 14: Line 56:
 * Done [[https://github.com/gw-vis/userapps/issues/151|#151]]: Gathered the pin assignment information of Type-A
 * Done [[https://github.com/gw-vis/userapps/issues/xx|#xx]]:

Project

Schedule of VIS after O3

Github Issues

Sprint

Sprint09: 01/11 - 01/22

Schedule

Closed issues

Sprint08: 12/28 - 01/08

Schedule

Closed issues

Sprint08: 12/18 - 12/25

Schedule

Closed issues

Sprint07: 12/07 - 12/18

Schedule

Closed issues

Sprint06: 11/23 - 12/04

Schedule

Closed issues

Sprint05: 11/09 - 11/20

Schedule

Closed issues

Sprint04: 10/16 - 11/06

Schedule

Closed issues

Sprint03: 10/12 - 10/23

Schedule

  • Power outage in 10/14

Closed issues

  • Done #160: Fabian wrote procedure document for the venting.

  • Done #151: Gathered the pin assignment information of Type-A

  • Done #xx:

  • Done #xx:

Sprint02: 09/28 - 10/09

Schedule:

  • None

Closed issues

  • Done #110: Ikeda-san prepared the EPICS channel for limit switches

  • Done #166: Ikeda-san ordered some temperature controller for prototype. It will deliver in 12/16.

  • Done #164: Ikeda-san prepare the EPICS channel to know the position of the limit switch.

  • Done #003: Ikeda-san fix the bug that the script stop randomly.

Sprint01: 09/14 - 09/25

Holiday: 09/21,09/22

  • None

Closed issues

  • Done #49: Make the new directory structure to avoid messy workspace.

  • Done #53: same as #49. Duplicated issue.

  • Done #11: We decided not to divide the VIS RT-model into the tower and payload part towards O4.

  • Done #16: Made the test point for CAL to inject the excitation signal to the VIS suspensions.

  • Done #23: Made VIS_OVERVIEW.adl

  • Done #12: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.

  • Done #142: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.

  • Done #125: Sato-san checked the direction of rotation for the stepper motor.

  • Done #141: Make new repository named 'pcas-controller' for stepper motor. I hope this repository will integrate all controllers in KAGRA, e.g. picomotor, half wave plate, and function generator.