Differences between revisions 4 and 9 (spanning 5 versions)
Revision 4 as of 2020-09-12 09:51:48
Size: 242
Editor: KousekiMiyo
Comment:
Revision 9 as of 2020-09-12 10:22:56
Size: 1303
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== Project ==
Line 6: Line 7:
=== 08/14 - 08/25 ===
Holiday : 08/21,08/22
=== 09/28 - 10/09 ===
Holiday:
 *
Line 9: Line 11:
 *
=== 09/14 - 09/25 ===
Scope:
Holiday: 09/21,09/22
 * Done [[https://github.com/gw-vis/userapps/issues/49|#49]]: Make the new directory structure to avoid messy workspace.
 * Done [[https://github.com/gw-vis/userapps/issues/53|#53]]: same as #49. Duplicated issue.
 * Done [[https://github.com/gw-vis/userapps/issues/11|#11]]: We decided not to divide the VIS RT-model into the tower and payload part towards O4.
 * Done [[https://github.com/gw-vis/userapps/issues/16|#16]]: Made the test point for CAL to inject the excitation signal to the VIS suspensions.
 * Done [[https://github.com/gw-vis/userapps/issues/23|#23]]: Made VIS_OVERVIEW.adl
 * Done [[https://github.com/gw-vis/userapps/issues/12#12]]: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally.
 * Done [[https://github.com/gw-vis/userapps/issues/xx#xx]]:
 * Done [[https://github.com/gw-vis/userapps/issues/xx#xx]]:
 * Done [[https://github.com/gw-vis/userapps/issues/xx#xx]]:

Project

Schedule of VIS after O3

Github Issues

Sprint

09/28 - 10/09

Holiday:

09/14 - 09/25

Scope: Holiday: 09/21,09/22

KAGRA/Subgroups/VIS/Schedule (last edited 2021-04-10 08:43:49 by KousekiMiyo)