Line 9: Line 9:
|| ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=subject&op%5Bsubject%5D=%7E&v%5Bsubject%5D%5B%5D=ITMY&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=12&month=3&year=2021&zoom=2|ITMY]] ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=103&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=12&month=3&year=2021&zoom=4|Hirata]] || || ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=category_id&op%5Bcategory_id%5D=%3D&v%5Bcategory_id%5D%5B%5D=29&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=12&month=3&year=2021&zoom=2|ITMY]] ||[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt?utf8=%E2%9C%93&set_filter=1&gantt=1&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=assigned_to_id&op%5Bassigned_to_id%5D=%3D&v%5Bassigned_to_id%5D%5B%5D=103&f%5B%5D=&query%5Bdraw_relations%5D=0&query%5Bdraw_relations%5D=1&query%5Bdraw_progress_line%5D=0&months=12&month=3&year=2021&zoom=4|Hirata]] ||
Line 16: Line 16:
Old VIS schedule had been used from 2021/03 is in [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|JGW-L2011475]]
Line 17: Line 18:
Old VIS schedule had been used from 2021/03 is in [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|JGW-L2011475]]
== Milestones ==
|| || Installation || Integration in air || Integration in vacuum|| Integration with IFO||
||ETMX ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]] ||

Schedule

KAGRA

Suspension-wise

People-wise

All

ETMX

Takahashi (Type-A leader)

IFO

ITMX

Fabian (Type-B leader)

CAL

ETMY

Sato

ITMY

Hirata

PRs

Ikeda

BS/SRs

Miyo

Input Optics suspensions

Ushiba (CRY)

Output Optics susspensions

Kimura (CRY/VAC)

Transmitter Suspensions (TRs)

Akutsu (AOS)

Old VIS schedule had been used from 2021/03 is in JGW-L2011475

Milestones

Installation

Integration in air

Integration in vacuum

Integration with IFO

ETMX

#108