|| || Installation || Integration in air || Integration in vacuum|| Integration with IFO||
|| [[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]]

Schedule

KAGRA

Suspension-wise

People-wise

All

ETMX

Takahashi (Type-A leader)

IFO

ITMX

Fabian (Type-B leader)

CAL

ETMY

Sato

ITMY

Hirata

PRs

Ikeda

BS/SRs

Miyo

Input Optics suspensions

Ushiba (CRY)

Output Optics susspensions

Kimura (CRY/VAC)

Transmitter Suspensions (TRs)

Akutsu (AOS)

Old VIS schedule had been used from 2021/03 is in JGW-L2011475

Milestones

|| || Installation || Integration in air || Integration in vacuum|| Integration with IFO|| || #108