8152
Comment:
|
8151
|
Deletions are marked like this. | Additions are marked like this. |
Line 20: | Line 20: |
|| || Installation || Integration in air || Integration in vacuum|| Integration with IFO|| | || || Installation || Integration in air || Integration in vacuum|| Integration with IFO|| |
Contents
Schedule
KAGRA |
Suspension-wise |
People-wise |
|
||
|
||
|
||
|
||
|
||
|
Old VIS schedule had been used from 2021/03 is in JGW-L2011475
Milestones
|
Installation |
Integration in air |
Integration in vacuum |
Integration with IFO |
|| #108