Schedule
KAGRA |
Suspension-wise |
People-wise |
|
||
|
||
|
||
|
||
|
||
|
Old VIS schedule had been used from 2021/03 is in JGW-L2011475
Milestones
|
Installation |
Integration in air |
Integration in vacuum |
Integration with IFO |
ETMX |