Differences between revisions 90 and 91
Revision 90 as of 2021-03-29 11:22:32
Size: 8209
Editor: KousekiMiyo
Comment:
Revision 91 as of 2021-03-29 11:23:17
Size: 8203
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
||ETMX ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|--(#108)--]] || || ||ETMX ||[[https://dacgit.icrr.u-tokyo.ac.jp/issues/108|#108]] || ||

Schedule

KAGRA

Suspension-wise

People-wise

All

ETMX

Takahashi (Type-A leader)

IFO

ITMX

Fabian (Type-B leader)

CAL

ETMY

Sato

ITMY

Hirata

PRs

Ikeda

BS/SRs

Miyo

Input Optics suspensions

Ushiba (CRY)

Output Optics susspensions

Kimura (CRY/VAC)

Transmitter Suspensions (TRs)

Akutsu (AOS)

Old VIS schedule had been used from 2021/03 is in JGW-L2011475

Milestones

Installation

Integration

tower

payload

In air

In vacuum

In vacuum With IFO

In 100K with IFO

ETMX

#108

KAGRA/Subgroups/VIS/Schedule (last edited 2021-04-10 08:43:49 by KousekiMiyo)