'''iKAGRA ETM suspension; Status''' | == iKAGRA ETM suspension Preparation; Current status == ==== Schedule ==== 12th- (2 weeks) Disassembling and Washing (favorable) 25th- (2 weeks) Assembling and Hanging 1th Feb- coil winding, transportation to the End, installation test 7th Feb- check 15th installation ==== Disassembling at Mitaka[Ohishi] ==== finished. (12th-19th) [problem] * 2 nuts stuck: solved by Hirata-san * A Cu screw stuck: solved by Hirata-san ==== Washing [Hirata-san] ==== most of the parts were washed. [problem] * ultra sonic washer broken 20th ordered on 22th(Fri) will be arrive at Mitaka on 26th(Tue) * 8 screws for adjusting the IM holding plate was dirty Solution: order new screws (not ordered yet) ==== Missing parts ==== * coil bobbin [Takahashi-san] * coil winding [students of Ando-lab] * D-sub fixture plates [Takahashi-san] * mirror container [Tatsumi-san] * magnets for dummy mirror (4 ; 2-phi-L-5mm Nd magnets) [Ohishi] * some screws in replace with Cu screws [Ohishi] ==== pico-motors and PZTs ==== ==== coil driver ==== ==== cables ==== ==== Assembling ==== On 21th, suspension frame, security frame, xy stages completed [Tomaru] ==== Hanging ==== ==== Transfer Function Measurement ==== |
iKAGRA ETM suspension Preparation; Current status
Schedule
- 12th- (2 weeks) Disassembling and Washing (favorable) 25th- (2 weeks) Assembling and Hanging 1th Feb- coil winding, transportation to the End, installation test 7th Feb- check 15th installation
Disassembling at Mitaka[Ohishi]
- finished. (12th-19th)
- [problem]
- 2 nuts stuck: solved by Hirata-san
- A Cu screw stuck: solved by Hirata-san
Washing [Hirata-san]
- most of the parts were washed.
- [problem]
- ultra sonic washer broken 20th ordered on 22th(Fri) will be arrive at Mitaka on 26th(Tue)
- 8 screws for adjusting the IM holding plate was dirty
- Solution: order new screws (not ordered yet)
Missing parts
- coil bobbin [Takahashi-san]
- coil winding [students of Ando-lab]
- D-sub fixture plates [Takahashi-san]
- mirror container [Tatsumi-san]
- magnets for dummy mirror (4 ; 2-phi-L-5mm Nd magnets) [Ohishi]
- some screws in replace with Cu screws [Ohishi]
pico-motors and PZTs
coil driver
cables
Assembling
- On 21th, suspension frame, security frame, xy stages completed [Tomaru]
Hanging