== iKAGRA ETM suspension preparation log == == Type-C suspensions ==
Line 3: Line 3:
==== Schedule ====
 * 12th Jan- (2 weeks) Disassembling, Washing, and transportation
 * 25th Jan - (2 weeks) Assembling and Test Hanging with an Al dummy mirror
 * 7th Feb- (1 week) coil winding, measurement of transfer function, transportation to the End area and installation test
 * 15th Feb- (1 week)installation
 Type-C suspension means double pendulums, some of which were once used for TAMA300.

=== iKAGRA ===

 Five TAMA-type suspensions were used for iKAGRA.<<BR>>
 3 PO type; MC_i, MC_e, MC_o and 2 TM or RM type; ETMX, ETMY.
Line 9: Line 10:
==== Disassembling at ATC Mitaka [Ohishi] (12th-19th Jan.) ====
  * Two nuts stuck. Hirata-san removed them.
  * A Cu screw stuck. Hirata-san removed it.
==== Washing and transportation to Kamioka [Hirata-san] ====
  * The ultra sonic washer at ATC was broken on 20th Jan.
  A new washer was ordered on 22th(Fri) and arrived at Mitaka on 25th(Mon).
  * Eight screws for adjusting the IM holding plate was dirty.
  Takahashi-san ordered similar screws.
==== New parts ====
 * Coil bobbin [Takahashi-san, Tatsumi-san]
  [[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0047/T1604741/001/Coil_Preparation_2016.pdf|coil bobbin]]
  * The outer diameter of the coil has been changed from 14.2mm to 14.5mm.
  * Due to this change, the number of winding becomes 39 from 41.
 * Coil winding [Kuwahara-san, and Ushiba-san from U-Tokyo]
  * Lead wires from the bobbin to Dsub connector were too short (20cm). The length must be 40cm or more.
  * At the end of the lead wires, D-sub pins are swaged. We have run short of pins and waiting for delivery on 29th Feb(Mon).
  * Peeling off the coating of wires longer than the length of those pins make the wire broken easily.
 * D-sub fixture plates [Takahashi-san]
  * M3 holes were drilled to phi3.2 holes.
 * Mirror container [Tatsumi-san]
  [[attachment:MirrorContainer.pdf|{{attachment:MirrorContainer.pdf||width=600}}]]<<BR>>
 * Magnets for dummy mirror (4 ; 2-phi-L-5mm Nd magnets) [Tomaru, Yamamoto]
 Work log about 2 iKAGRA ETMs is [[KAGRA/Subgroups/VIS/Type-C/iKAGRA_ETM|here]].
Line 32: Line 12:
 * Screws in replace with Cu screws [Ohishi]
 [problem] replaced all Cu screws to stainless. Magnetism problem was indicated.
==== Pico-motors and PZTs ====
 We have 4 pico-motors except for x-axis (the direction of the light )
 y, z, pitch, yaw
==== Coil driver ====
 We use KAGRA coil driver; we need to cheek its performance.
==== Cables ====

==== Assembling [Tomaru-san, Ohishi, Yamamoto-san] ====
 On 21th, suspension frame, security frame, xy stages completed
=== toward bKAGRA ===
=== bKAGRA ===
Line 44: Line 15:
==== Hanging ====
 Hanging jig preparation

==== Transfer Function Measurement ====

==== Transportation to the End [Prof. Kimura, Sawada-san, Tomaru-san(KEK),]====
 KEK

==== Mirrors ====
 Two TAMA PRM mirrors (with about 50% and 90% reflectivities each, resultant contrast becomes 96%) were delivered to Kamioka on 12th Feb.
 
==== Installation ====

Type-C suspensions

  • Type-C suspension means double pendulums, some of which were once used for TAMA300.

iKAGRA

  • Five TAMA-type suspensions were used for iKAGRA.
    3 PO type; MC_i, MC_e, MC_o and 2 TM or RM type; ETMX, ETMY.

    Work log about 2 iKAGRA ETMs is here.

toward bKAGRA

bKAGRA