1353
Comment:
|
2148
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== iKAGRA ETM suspension Preparation; Current status == | == iKAGRA ETM suspension preparation log == |
Line 3: | Line 3: |
==== Schedule ==== * 12th Jan- (2 weeks) Disassembling and Washing (favorable) * 25th Jan - (2 weeks) Assembling and Hanging with dummy mirror * 1th Feb- coil winding, transportation to the End, installation test * 7th Feb- check * 15th installation |
==== original schedule ==== * 12th Jan- (2 weeks) Disassembling, Washing, and transportation * 25th Jan - (2 weeks) Assembling and Test Hanging with dummy mirror * 7th Feb- (1 week) coil winding, measurement of transfer function, transportation to the End area and installation test * 15th Feb- (1 week)installation |
Line 10: | Line 9: |
==== Disassembling at Mitaka[Ohishi] ==== finished. (12th-19th) |
==== Disassembling at Mitaka [Ohishi] ==== status: finished. (12th-19th) |
Line 15: | Line 14: |
==== Washing [Hirata-san] ==== most of the parts were washed. |
==== Washing and transportation to Kamioka [Hirata-san] ==== status: finished. |
Line 21: | Line 20: |
Solution: order new screws (not ordered yet) ==== Missing parts ==== * coil bobbin [Takahashi-san] * coil winding [students of Ando-lab] * D-sub fixture plates [Takahashi-san] |
Solution: order new screws (by Takahashi-san) ==== New parts ==== status: finished. * coil bobbin [Takahashi-san] * coil winding [students of Ando-lab] * coil wires from the bobbin to Dsub connector were too short(20cm). The length of Must be 40cm or more. * At the end of coil wires, D-sub pins are swaged. We have run short of pins and waiting for delivery on 29th. * Peeling off the coating of wires longer than the length of those pins make the wire broken easily. * D-sub fixture plates [Takahashi-san] * M3 holes were drilled to phi3.2 holes. |
Line 27: | Line 31: |
* magnets for dummy mirror (4 ; 2-phi-L-5mm Nd magnets) [Ohishi] | * reference * magnets for dummy mirror (4 ; 2-phi-L-5mm Nd magnets) [Tomaru, Yamamoto] |
Line 29: | Line 35: |
[problem] replaced all Cu screws to stainless. Magnetism problem was indicated. | |
Line 31: | Line 37: |
We have 4 pico-motors except for x-axis (the direction of the light ) y, z, pitch, yaw |
|
Line 33: | Line 40: |
We use KAGRA coil driver; we need to cheek its performance. | |
Line 36: | Line 43: |
==== Assembling [Tomaru, Ohishi, Yamamoto]==== | ==== Assembling [Tomaru, Ohishi, Yamamoto] ==== |
Line 43: | Line 50: |
==== Transportation to the End ==== ==== Installation ==== |
iKAGRA ETM suspension preparation log
original schedule
- 12th Jan- (2 weeks) Disassembling, Washing, and transportation
- 25th Jan - (2 weeks) Assembling and Test Hanging with dummy mirror
- 7th Feb- (1 week) coil winding, measurement of transfer function, transportation to the End area and installation test
- 15th Feb- (1 week)installation
Disassembling at Mitaka [Ohishi]
- status: finished. (12th-19th)
- [problem]
- 2 nuts stuck: solved by Hirata-san
- A Cu screw stuck: solved by Hirata-san
Washing and transportation to Kamioka [Hirata-san]
- status: finished.
- [problem]
- ultra sonic washer broken 20th ordered on 22th(Fri) will be arrive at Mitaka on 26th(Tue)
- 8 screws for adjusting the IM holding plate was dirty
- Solution: order new screws (by Takahashi-san)
New parts
- status: finished.
- coil bobbin [Takahashi-san]
- coil winding [students of Ando-lab]
- coil wires from the bobbin to Dsub connector were too short(20cm). The length of Must be 40cm or more.
- At the end of coil wires, D-sub pins are swaged. We have run short of pins and waiting for delivery on 29th.
- Peeling off the coating of wires longer than the length of those pins make the wire broken easily.
- D-sub fixture plates [Takahashi-san]
- M3 holes were drilled to phi3.2 holes.
- mirror container [Tatsumi-san]
- reference
- magnets for dummy mirror (4 ; 2-phi-L-5mm Nd magnets) [Tomaru, Yamamoto]
- some screws in replace with Cu screws [Ohishi] [problem] replaced all Cu screws to stainless. Magnetism problem was indicated.
pico-motors and PZTs
- We have 4 pico-motors except for x-axis (the direction of the light ) y, z, pitch, yaw
coil driver
- We use KAGRA coil driver; we need to cheek its performance.
cables
Assembling [Tomaru, Ohishi, Yamamoto]
- On 21th, suspension frame, security frame, xy stages completed
Hanging
- Hanging jig preparation
Transfer Function Measurement
Transportation to the End