Information of the Type-A Seismic Attenuation System (SAS). This page wants information about not only room-temperature parts but also cryogenic vibration isolation system. |
Line 4: | Line 4: |
= Type-A Meeting on 2016/6/28 = 2016/6/28 13:00 - 14:30 @The 4th meeting room |
<<TableOfContents(3)>> |
Line 7: | Line 6: |
Participants: Takahashi, Ishizaki, Sato, Okutomi | ------ [[TypeAdesign|{{attachment:figTypeAsasNamed2.png||width=25%,align="right"}}]] |
Line 9: | Line 9: |
=== Minutes === 0-1 Assembly model (Ishizaki) * Made the test setup. 0-2 Simulation (Okutomi) * No progress. The results will be reported in the next VIS meeting. 1-1 Clean Booth (FCL) * Present design: The booth is hung from the ceiling. 2-3 Setting of cross chamber (VAC) * From 8th July, presence on 11th. 3-5 ACC preparation (Sato) * Working space: The 20m lab was arranged on 27th. 4-3 Standard filter (Hirata) * Assembly of FR and measurement: 1 set was finished. 5-1 Manufacturing of blade (Takahashi) * Cutting: 6 blades by July + 6 blades by Sep. 5-6 Design of damper (Sato) * Device: It is difficult to put the devices at the center of suspension point. 6-1 Design of EQ stop (Ishizaki) * Modeling: 3D model for the test setup was built. 6-3 Test of prototype * Frame lock, extension rods, adjusters were delivered. * Hoist's tool will be necessary. * Test items related to the frame design have high priority. Target date is 22th July. 6-4 Design of release sensor (Sato) * Bases and shims were delivered. * Plate additional machining: Delivery on 29th. * Circuit: LED box was made. Cabling has not been applied yet. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Cartoon: Okutomi should send to Ishizaki soon! 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan is made parallel with test work. Check the list of test items. 9-2 Transportation to 2F (Takahashi, Ishizaki) * Situation of the site will be checked in 5-7th July. * Electric crawler is limitted, for example, for 200kg load. 9-3 Cable assembly (Sato) * Number of cables: CRY will decide it by the end of June. |
== Drawings == |
Line 46: | Line 11: |
Next meeting: 2016/7/5 13:00 | * Type-A SAS whole assy * Vacuum chamber * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5794|Vertical]] (IXV, EXV, IYV, EYV) * Cryostat |
Line 48: | Line 16: |
= Type-A Meeting on 2016/6/21 = 2016/6/21 13:00 - 14:00 by Skype |
=== Room-temperature parts === * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5460|Earthquake stop - Security frame]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5634|Pre-Isolator]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5636|Top Filter]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5637|Inverted Pendulum]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5638|F0 LVDT-actuator unit]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5639|Blade spring for static position adjustment]] * Magnetic Damper * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5635|Standard Filter]] * Bottom Filter * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5656|BF LVDT and Attachments]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2555|Fishing rod]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5743|Maraging wire]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5461|Dummy Payload]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5462|Hoist's tools]] |
Line 51: | Line 32: |
Participants: Takahashi, Ishizaki, Sato | === Cryogenics === * Cryo-Payload assy * Platform * Marionette * Marionette Recoil Mass * Intermediate Mass * Intermediate Recoil Mass * Sapphire Mirror (Test Mass) * Recoil Mass * Heat link * Heat link suspension |
Line 53: | Line 44: |
=== Minutes === 0-1 Assembly model (Ishizaki) * Made the test setup. 0-2 Simulation (Okutomi) * Deadline: The end of June 2-3 Setting of cross chamber (VAC) * Work: From 8th July, presence on 11th. 3-5 ACC preparation (Sato) * Make working space in the 20m lab on 27th June. 4-3 Standard filter (Hirata) * Assembly of FR and measurement: by August for 6 sets. 4-5 Procurement of magnets (Takahashi) * Size: 13mm, 72PSC for each 5-1 Manufacturing of blade (Takahashi) * Cutting: 6 blades by July + 6 blades by Sep. 5-6 Design of damper (Sato) * Device: The last one was too small, actually about 125mm. Design for vertical as well. 6-1 Design of EQ stop (Ishizaki) * Modeling: 3D model for the test setup was build. 6-3 Test of prototype * Frame lock: Delivered by 24th. * Other parts (rod, adjuster, bolts) will be ordered. 6-4 Design of release sensor (Sato) * Base: Making in ATC. * Plate additional machining: Ordered. * Circuit: LED will be tested. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Cartoon: Okutomi should send to Ishizaki soon! * Mirror holder: Refer the mirror box for PR. 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan: Check FR for 2 BFs. 9-3 Cable assembly * Number of cables: Thermocouples are added. Ask Tomaru total number. |
----- == Documents == === Reports === * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5196|Requirements for Type-A SAS]] |
Line 87: | Line 49: |
Next meeting: 2016/6/28 13:00 | === Installation Procedure === * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=410|Initial concept]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Installation procedure of Type-A system]] === Measurement and Analysis === * Type-A Control Simulation * [[https://docs.google.com/spreadsheets/d/1QlaeJ4hME5J6iZWzPmfPFsq5aKwTP3a-1Rd9sqKIExM/edit?usp=sharing|Parameters for simulation]] * Shared with Google spread sheet (Browsing and commenting are permitted. Please contact to Okutomi for editing permission.) |
Line 89: | Line 57: |
= Type-A Meeting on 2016/6/14 = 2016/6/14 13:00 - 15:00 @ Room 210 |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5105|[2016.08.15] Measurements of Standard Filter]] . Data of weight, optimal load, GAS resonant frequency, keystone height . Combination of the standard filters for Type-A with ID * Heavy set: 3-2(F1), 2-2(F2), 1-4(F3) * Light set: 3-3(F1), 2-1(F2), 1-3(F3) |
Line 92: | Line 63: |
Participants: Takahashi, Ishizaki, Sato, Okutomi | * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5707|[2016.09.30] Measurements of BF LVDT Prototype]] |
Line 94: | Line 65: |
=== Minutes === 0-1 Assembly model (Ishizaki) * Step: From EQ stop, next with chamber. 0-2 Simulation (Okutomi) * Problem: Conversion to Simulink was ok. The structure of control has a problem in Matlab. Reconstructing now. 3-5 ACC preparation (Sato) * Space: Make working space in the 20m lab. 5-1 Manufacturing of blade (Takahashi) * Design: 5 blades are used for 200kg load. 5-6 Design of damper (Sato) * Device: Asking design of LVDT-Act. to VIRGO. The device is located at the center of mass. 6-1 Design of EQ stop (Ishizaki) * Structure analysis: Two cases were calculated. Share stress was 1/6 of limit, and principal stress was 1/7 of limit respectively in the maximum case. * Modeling: Making with consideration of procedure and tools. * Frame lock: Maximum stress was 160MPa with thickness of 30mm (limit 180MPa). 6-4 Design of release sensor (Sato) * Position: Inner side of the stage. Need to addtional machining to the EQ stop plate. * Electronics: Circuit is simple in the test (handmade). 8-1 Design of dummy payload (Okutomi, Ishizaki) * Condition: 25cm mirror, alignment by moving mass. Make a cartoon. * Actuation: Length control is necessary? Check PZT actuator. 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs. |
----- == Electronics == [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5193|List of drivers for VIS]] * LVDT * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2826|LVDT Driver]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2117|LVDT-coil distributor]] * LVDT-coil combiner * Accelerometer * ACC driver * Coil-magnet actuator * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3502|High power coil driver]] * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3506|Low power coil driver]] * Optical lever * QPD board * Stepper motor * Stepper motor driver * Picomotor * Picomotor driver * Cabling |
Line 118: | Line 85: |
Next meeting: 2016/6/21 13:00 | ----- == Members of Type-A Team == . Ryutaro TAKAHASHI (Leader) . Hideharu ISHIZAKI . Naohisa SATO . Koki OKUTOMI == Schedule == [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|Task list]] == Meeting == * VIS Meeting [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/MeetingNAOJ|Minutes]] * Type-A team meeting [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes]] == See also == * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4005|JGW-E1504005]]: VIS Document and Drawing Tree (Type-A) * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/CRY|KAGRA/Subgroups/CRY]] |
Information of the Type-A Seismic Attenuation System (SAS). This page wants information about not only room-temperature parts but also cryogenic vibration isolation system.
Contents
Drawings
- Type-A SAS whole assy
- Vacuum chamber
Vertical (IXV, EXV, IYV, EYV)
- Cryostat
Room-temperature parts
- Magnetic Damper
- Bottom Filter
Cryogenics
- Cryo-Payload assy
- Platform
- Marionette
- Marionette Recoil Mass
- Intermediate Mass
- Intermediate Recoil Mass
- Sapphire Mirror (Test Mass)
- Recoil Mass
- Heat link
- Heat link suspension
Documents
Reports
Installation Procedure
Measurement and Analysis
- Type-A Control Simulation
- Shared with Google spread sheet (Browsing and commenting are permitted. Please contact to Okutomi for editing permission.)
[2016.08.15] Measurements of Standard Filter
- Data of weight, optimal load, GAS resonant frequency, keystone height
- Combination of the standard filters for Type-A with ID
- Heavy set: 3-2(F1), 2-2(F2), 1-4(F3)
- Light set: 3-3(F1), 2-1(F2), 1-3(F3)
Electronics
- LVDT
- LVDT-coil combiner
- Accelerometer
- ACC driver
- Coil-magnet actuator
- Optical lever
- QPD board
- Stepper motor
- Stepper motor driver
- Picomotor
- Picomotor driver
- Cabling
Members of Type-A Team
- Ryutaro TAKAHASHI (Leader)
- Hideharu ISHIZAKI
- Naohisa SATO
- Koki OKUTOMI
Schedule
Meeting
See also
JGW-E1504005: VIS Document and Drawing Tree (Type-A)