Differences between revisions 2 and 45 (spanning 43 versions)
Revision 2 as of 2016-06-15 17:41:19
Size: 1524
Comment:
Revision 45 as of 2016-09-07 10:19:54
Size: 560
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Minutes of the Type-A Meeting on 2016/6/14 =
2016/6/14 13:00 - 15:00 @ Room 210
<<TableOfContents(3)>>
Line 4: Line 3:
Participants: Takahashi, Ishizaki, Sato, Okutomi = Design =
Line 6: Line 5:
== Task list ==
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792]]
Line 9: Line 6:
=== Minutes ===
 0-1 Assembly model (Ishizaki): From EQ stop, next with chamber.
 0-2 Simulation (Okutomi): Conversion from SUMCON to Simulink was ok. Problem is the structure of control in Matlab. Reconstrunting now.
 3-5 ACC preparation (Sato): Make working space in the 20m lab.
 5-1 Manufacturing of blade (Takahashi): Target of 200kg, 5 blades are used.
 5-6 Design of damper (Sato): Asking design of LVDT-Act. from VIRGO. The device is placed at the center of mass.
 6-1 Design of EQ stop (Ishizaki)
  * Structure analysis: Two cases were calculated. Share stress was 1/6 of limit, and principal stress was 1/7 of limit in the max. case.
  * Modeling: Making with consideration of procedure and tools.
  * Frame lock: Max. stress was 160MPa with +5mm thickness (limit 180MPa).
 6-4 Design of release sensor (Sato)
  * Position: Inner side of the stage. Need to addtional machining to the EQ stop plate.
  * Electronics: Circuit is simple in the test (handmade).
 8-1 Design of dummy payload (Okutomi, Ishizaki)
  * Condition: 25cm mirror, alignment by moving mass. Make a cartoon.
  * Actuation: Length control is necessary? Check PZT actuator.
 9-1 Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs.
= Task list =
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|L1604792]]: Task for Type-A
Line 27: Line 9:
=== Next meeting ===
2016/6/21 13:00
= Meeting =

---- /!\ '''Edit conflict - other version:''' ----
 * Type-A team meeting
 [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes]]

---- /!\ '''Edit conflict - your version:''' ----
 * Type-A team meeting >> [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes]]

---- /!\ '''End of edit conflict''' ----

Design

Task list

L1604792: Task for Type-A

Meeting


/!\ Edit conflict - other version:



/!\ Edit conflict - your version:



/!\ End of edit conflict


KAGRA/Subgroups/VIS/TypeA (last edited 2021-11-02 17:29:27 by naohisa.sato)