== Task list == [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792]] |
<<TableOfContents(3)>> |
Line 4: | Line 3: |
= Type-A Meeting on 2016/7/26 = 2016/7/26 13:00 - 14:20 @Room210 |
= Design = . [[TypeAdesign|{{attachment:figTypeAsasNamed.png||width=25%,align="right"}}]] == Mechanical Components == * Pre-Isolator (PI) * Inverted pendulum (IP) * Top filter (TF) * Magnetic damper (MD) * Standard filter (SF) * Bottom filter (BF) * Cryopayload (CRYp) * Platform (PF) * Marionette (MN) * Marionette recoil mass (MNR) * Intermediate mass (IM) * Intermediate recoil mass (IRM) * Optics (OP, test mass, TM) * Recoil mass (RM) |
Line 7: | Line 21: |
Participants: Takahashi, Ishizaki, Sato, Okutomi | == Drawings == * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5633|Pre-Isolator]] |
Line 9: | Line 24: |
=== Minutes === 0-1 Assy. (Ishizaki) * The modeling of EQ stop was almost finished. * The model of chamber will be added to it. 0-2 Simulation (Okutomi) * Calculated the effect due to actuation point for BF. * Noise will be induced to the actuators taking account of measured LVDT. 1-1 Clean booth (FCL) * Design of suspended booth was shown. * The lighting is OK? 3-2 Assembly of TF+IP (Sato) * Decision on the working place is under negosiation. * From August 30. 3-5 ACC preparation (Sato) * Additional 3 sets will be taken by the end of July. 4-2,3 Standard filter (Hirata) * The 4th set is on going. 4-5 Procurement of damper magnet * Ordered. 5-1 Manufacturing of blade (Takahashi) * Blades are in the thermal process. 5-6 Design of damper (Sato) * Made drawings for LVDT prototype. * Make drawings for EQ stop side. 5-8 Test of LVDT (Okutomi) * Set the sample from VIRGO in the 20m lab. * Making connector cables. * Micrometer stage and some jigs are necessary. 6-1 Design of EQ stop (Ishizaki) * Made 3D model and 2D drawings. * Bottom support for the dummy payload is necessary. * Gap of the side stopper should be 10mm. * Adjustment of top ring position is not necessary. 6-3 Test of prototype (Ishizaki) * Outer diameter of the plate will be reduced on 20th. 6-4 Design of release sensor (Sato) * The shape of jigs was modified with 30mm in height. * Gutter for cables is necessary. 8-1 Design of dummy payload (Okutomi, Ishizaki) * The height was reduced. 9-3 Cable assembly (Sato) * This task was postponed. 9-6 Protection net (Okutomi) * The smallest bolt size was M3. |
|
Line 54: | Line 25: |
Next meeting: 2016/8/1 13:00 | |
Line 56: | Line 26: |
= Type-A Meeting on 2016/7/19 = 2016/7/19 13:00 - 15:00 @Room210 |
----- = Schedule = [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|Task list]] |
Line 59: | Line 30: |
Participants: Takahashi, Ishizaki, Sato, Okutomi(Skype) | = Meeting = |
Line 61: | Line 32: |
=== Minutes === 0-1 Assy, (Ishizaki) * The plate for BF is in the center of cross tube. 0-2 Simulation (Okutomi) * Calculate the effect due to actuation point for BF. 2-3 Setting of cross chamber (VAC) * Remained horizontal deviation between the top flange on the cryostat and the top chamber was 1-4mm. 3-2 Assembly of TF+IP (Sato) * The assembly work was rescheduled. From the end of August at the site. 3-5 ACC preparation (Sato) * Additional 3 sets will be taken from NM1 in TAMA by the end of July. * ACCs will be calibrated at the site. 4-2,3 Standard filter (Hirata) * 3 sets were finished. 5-1 Manufacturing of blade (Takahashi) * Blades are in the thermal process. 5-6 Design of damper (Sato) * Samples of LVDT have been delivered from VIRGO. * Design work is going. 6-1 Design of EQ stop (Ishizaki) * Made 3D model and some 2D drawings. * Guide for lift down is necessary. 6-3 Test of prototype (Ishizaki) * Outer diameter of the plate will be reduced on 20th. 6-4 Design of release sensor (Sato) * Length of the present lead cable is too short. Longer ones will be prepared for actual setup. 7-2 Long Maraging rod (Takahashi) * Rod for cryo-payload should be lift down at beginning and fixed on the protection net temporally. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Made drawings. The present design is too tall. * Confirm the height of mounted items. 9-6 Protection net (Okutomi) * Check the small bolts size to decide the mesh of net. Next meeting: 2016/7/26 13:00 = Type-A Meeting on 2016/7/12 = 2016/7/12 11:00 - 12:30 @Kashiwa Participants: Takahashi, Ishizaki(Skype), Sato, Okutomi === Minutes === 0-2 Simulation (Okutomi) * The frequency shift was due to damping model. * Setting for GAS filters was corrected. * Going BF damping simulation by manual tuning. * Result will be reported by the VIS meeting. 2-3 Setting of cross chamber (VAC) * Horizontal position of the top flange on the cryostat was different from the center of the top chamber by 25mm along beam axis. 3-2 Assembly of TF+IP (Sato) * The place should be in the center room of KAGRA considering DGS setup. 3-5 ACC preparation (Sato) * 6 sets of ACC were measured. * Additional 3 sets will be taken from NM1 in TAMA on 14th. * Tube for the spot cooler was set. 4-2,3 Standard filter (Hirata) * 2 sets were finished. 5-1 Manufacturing of blade (Takahashi) * Cutting of 22 blades was finished. 5-6 Design of damper (Sato) * Original design from VIRGO does not fit to the space around BF. * The bending point is higher than the suspension point. 6-1 Design of EQ stop (Ishizaki) * Made outer shape of end plate. 6-3 Test of prototype (Ishizaki) * Assembling of the EQ stop prototype was started. * Thin dummy weights were prepared. * I-bolts on the plate were interfered with connection rods. * Outer diameter of the stop plate was larger than inner diameter of the frame lock. 6-4 Design of release sensor (Sato) * 3 sensors were attached to the plate for the prototype test. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Circular type weight is suitable for combined dummy load. * Okutomi will send a cartoon soon. 9-5 Installation * Protection for falling items is necessary. Check the small bolts size to decide the mesh of net. * Discuss on evacuation of the chamber. Next meeting: 2016/7/19 13:00 = Type-A Meeting on 2016/7/5 = 2016/7/5 13:00 - 14:00 @Kamioka Participants: Takahashi, Ishizaki, Sato, Okutomi === Minutes === 0-2 Simulation (Okutomi) * The frequency shift might be due to damping model. * Matlab model was remade. * Sensors and actuators were added to the BF stage. 1-1 Clean Booth (FCL) * The booth will be ready in December. 2-1 Setting of top chamber (VAC) * The schedule was shifted to December. 2-3 Setting of cross chamber (VAC) * From 8th July, presence on 11th. 3-2 Assembly of TF+IP (Sato) * The place should be considered again. 3-5 ACC preparation (Sato) * 5 sets of ACC were measured. 5-1 Manufacturing of blade (Takahashi) * Cutting of 12 blades was finished. 5-2 Assembly of BF (Hirata) * Will be started in September. 6-3 Test of prototype (Ishizaki) * The first setup and its procedure were shown. * Thin dummy weight and short hoock should be prepared. * Some cap screws on stop plates should be replaced to stop screws. 6-4 Design of release sensor (Sato) * Under cable connection. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Interferometer test was canceld. * The EQ stop and the dummy payload should be ordered together in August. 9-2 Transportation to 2F (Takahashi, Ishizaki) * Situation of the Y-end was investigated. * Maximum box width, which can go through the tunnel, was 1.5m. * Access road from Mozumi entrance was improved. 9-3 Cable assembly (Sato) * Ask CRY number of cables. Next meeting: 2016/7/12 11:00 = Type-A Meeting on 2016/6/28 = 2016/6/28 13:00 - 14:30 @The 4th meeting room Participants: Takahashi, Ishizaki, Sato, Okutomi === Minutes === 0-1 Assembly model (Ishizaki) * Made the test setup. 0-2 Simulation (Okutomi) * No progress. The results will be reported in the next VIS meeting. 1-1 Clean Booth (FCL) * Present design: The booth is hung from the ceiling. 2-3 Setting of cross chamber (VAC) * From 8th July, presence on 11th. 3-5 ACC preparation (Sato) * Working space: The 20m lab was arranged on 27th. 4-3 Standard filter (Hirata) * Assembly of FR and measurement: 1 set was finished. 5-1 Manufacturing of blade (Takahashi) * Cutting: 6 blades by July + 6 blades by Sep. 5-6 Design of damper (Sato) * Device: It is difficult to put the devices at the center of suspension point. 6-1 Design of EQ stop (Ishizaki) * Modeling: 3D model for the test setup was built. 6-3 Test of prototype * Frame lock, extension rods, adjusters were delivered. * Hoist's tool will be necessary. * Test items related to the frame design have high priority. Target date is 22th July. 6-4 Design of release sensor (Sato) * Bases and shims were delivered. * Plate additional machining: Delivery on 29th. * Circuit: LED box was made. Cabling has not been applied yet. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Cartoon: Okutomi should send to Ishizaki soon! 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan is made parallel with test work. Check the list of test items. 9-2 Transportation to 2F (Takahashi, Ishizaki) * Situation of the site will be checked in 5-7th July. * Electric crawler is limitted, for example, for 200kg load. 9-3 Cable assembly (Sato) * Number of cables: CRY will decide it by the end of June. Next meeting: 2016/7/5 13:00 = Type-A Meeting on 2016/6/21 = 2016/6/21 13:00 - 14:00 by Skype Participants: Takahashi, Ishizaki, Sato === Minutes === 0-1 Assembly model (Ishizaki) * Made the test setup. 0-2 Simulation (Okutomi) * Deadline: The end of June 2-3 Setting of cross chamber (VAC) * Work: From 8th July, presence on 11th. 3-5 ACC preparation (Sato) * Make working space in the 20m lab on 27th June. 4-3 Standard filter (Hirata) * Assembly of FR and measurement: by August for 6 sets. 4-5 Procurement of magnets (Takahashi) * Size: 13mm, 72PSC for each 5-1 Manufacturing of blade (Takahashi) * Cutting: 6 blades by July + 6 blades by Sep. 5-6 Design of damper (Sato) * Device: The last one was too small, actually about 125mm. Design for vertical as well. 6-1 Design of EQ stop (Ishizaki) * Modeling: 3D model for the test setup was build. 6-3 Test of prototype * Frame lock: Delivered by 24th. * Other parts (rod, adjuster, bolts) will be ordered. 6-4 Design of release sensor (Sato) * Base: Making in ATC. * Plate additional machining: Ordered. * Circuit: LED will be tested. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Cartoon: Okutomi should send to Ishizaki soon! * Mirror holder: Refer the mirror box for PR. 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan: Check FR for 2 BFs. 9-3 Cable assembly * Number of cables: Thermocouples are added. Ask Tomaru total number. Next meeting: 2016/6/28 13:00 = Type-A Meeting on 2016/6/14 = 2016/6/14 13:00 - 15:00 @ Room 210 Participants: Takahashi, Ishizaki, Sato, Okutomi === Minutes === 0-1 Assembly model (Ishizaki) * Step: From EQ stop, next with chamber. 0-2 Simulation (Okutomi) * Problem: Conversion to Simulink was ok. The structure of control has a problem in Matlab. Reconstructing now. 3-5 ACC preparation (Sato) * Space: Make working space in the 20m lab. 5-1 Manufacturing of blade (Takahashi) * Design: 5 blades are used for 200kg load. 5-6 Design of damper (Sato) * Device: Asking design of LVDT-Act. to VIRGO. The device is located at the center of mass. 6-1 Design of EQ stop (Ishizaki) * Structure analysis: Two cases were calculated. Share stress was 1/6 of limit, and principal stress was 1/7 of limit respectively in the maximum case. * Modeling: Making with consideration of procedure and tools. * Frame lock: Maximum stress was 160MPa with thickness of 30mm (limit 180MPa). 6-4 Design of release sensor (Sato) * Position: Inner side of the stage. Need to addtional machining to the EQ stop plate. * Electronics: Circuit is simple in the test (handmade). 8-1 Design of dummy payload (Okutomi, Ishizaki) * Condition: 25cm mirror, alignment by moving mass. Make a cartoon. * Actuation: Length control is necessary? Check PZT actuator. 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs. Next meeting: 2016/6/21 13:00 |
* Type-A team meeting [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes]] |
Contents
Design
Mechanical Components
- Pre-Isolator (PI)
- Inverted pendulum (IP)
- Top filter (TF)
- Magnetic damper (MD)
- Standard filter (SF)
- Bottom filter (BF)
- Cryopayload (CRYp)
- Platform (PF)
- Marionette (MN)
- Marionette recoil mass (MNR)
- Intermediate mass (IM)
- Intermediate recoil mass (IRM)
- Optics (OP, test mass, TM)
- Recoil mass (RM)
Drawings
Schedule
Meeting
Type-A team meeting Minutes