1586
Comment:
|
274
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Minutes of the Type-A Meeting on 2016/6/14 = 2016/6/14 13:00 - 15:00 @ Room 210 |
<<TableOfContents(3)>> |
Line 4: | Line 3: |
Participants: Takahashi, Ishizaki, Sato, Okutomi | = Design = |
Line 6: | Line 5: |
== Task list == [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792]] |
|
Line 9: | Line 6: |
=== Minutes === 0-1 Assembly model (Ishizaki) * Step: From EQ stop, next with chamber. 0-2 Simulation (Okutomi) * Problem: Conversion to Simulink was ok. The structure of control has a problem in Matlab. Reconstructing now. 3-5 ACC preparation (Sato) * Space: Make working space in the 20m lab. 5-1 Manufacturing of blade (Takahashi) * Design: 5 blades are used for 200kg load. 5-6 Design of damper (Sato) * Device: Asking design of LVDT-Act. to VIRGO. The device is located at the center of mass. 6-1 Design of EQ stop (Ishizaki) * Structure analysis: Two cases were calculated. Share stress was 1/6 of limit, and principal stress was 1/7 of limit respectively in the maximum case. * Modeling: Making with consideration of procedure and tools. * Frame lock: Max. stress was 160MPa with +5mm thickness (limit 180MPa). 6-4 Design of release sensor (Sato) * Position: Inner side of the stage. Need to addtional machining to the EQ stop plate. * Electronics: Circuit is simple in the test (handmade). 8-1 Design of dummy payload (Okutomi, Ishizaki) * Condition: 25cm mirror, alignment by moving mass. Make a cartoon. * Actuation: Length control is necessary? Check PZT actuator. 9-1 Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs. |
= Task list = [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|L1604792]]: Task for Type-A |
Line 32: | Line 9: |
=== Next meeting === 2016/6/21 13:00 |
= Meeting = [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Meeting page]] |