1589
Comment:
|
3067
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Minutes of the Type-A Meeting on 2016/6/14 = | == Task list == [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792]] = Type-A Meeting on 2016/6/21 = 2016/6/21 13:00 - 14:00 by Skype Participants: Takahashi, Ishizaki, Sato === Minutes === 0-1 Assembly model (Ishizaki) * Made the test setup. 0-2 Simulation (Okutomi) * Deadline: The end of June 2-3 Setting of cross chamber (VAC) * Work: From 8th July, presence on 11th. 3-5 ACC preparation (Sato) * Make working space in the 20m lab on 27th June. 4-3 Standard filter (Hirata) * Assembly of FR and measurement: by August for 6 sets. 4-5 Procurement of magnets (Takahashi) * Size: 13mm, 72PSC for each 5-1 Manufacturing of blade (Takahashi) * Cutting: 6 blades by July + 6 blades by Sep. 5-6 Design of damper (Sato) * Device: The last one was too small, actually about 125mm. Design for vertical as well. 6-1 Design of EQ stop (Ishizaki) * Modeling: 3D model for the test setup was build. 6-3 Test of prototype * Frame lock: Delivered by 24th. * Other parts (rod, adjuster, bolts) will be ordered. 6-4 Design of release sensor (Sato) * Base: Making in ATC. * Plate additional machining: Ordered. * Circuit: LED will be tested. 8-1 Design of dummy payload (Okutomi, Ishizaki) * Cartoon: Okutomi should send to Ishizaki soon! * Mirror holder: Refer the mirror box for PR. 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan: Check FR for 2 BFs. 9-3 Cable assembly * Number of cables: Ask Tomaru on cryo-payload. = Type-A Meeting on 2016/6/14 = |
Line 5: | Line 47: |
== Task list == [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792]] |
|
Line 23: | Line 62: |
* Frame lock: Max. stress was 160MPa with thickness of 30mm (limit 180MPa). | * Frame lock: Maximum stress was 160MPa with thickness of 30mm (limit 180MPa). |
Line 30: | Line 69: |
9-1 Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs. | 9-1 Establishment of procedure (Takahashi, Okutomi) * Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs. |
Line 32: | Line 72: |
=== Next meeting === 2016/6/21 13:00 |
Next meeting: 2016/6/21 13:00 |
Task list
http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792
Type-A Meeting on 2016/6/21
2016/6/21 13:00 - 14:00 by Skype
Participants: Takahashi, Ishizaki, Sato
Minutes
- 0-1 Assembly model (Ishizaki)
- Made the test setup.
- Deadline: The end of June
- Work: From 8th July, presence on 11th.
- Make working space in the 20m lab on 27th June.
- Assembly of FR and measurement: by August for 6 sets.
- Size: 13mm, 72PSC for each
- Cutting: 6 blades by July + 6 blades by Sep.
- Device: The last one was too small, actually about 125mm. Design for vertical as well.
- Modeling: 3D model for the test setup was build.
- Frame lock: Delivered by 24th.
- Other parts (rod, adjuster, bolts) will be ordered.
- Base: Making in ATC.
- Plate additional machining: Ordered.
- Circuit: LED will be tested.
- Cartoon: Okutomi should send to Ishizaki soon!
- Mirror holder: Refer the mirror box for PR.
- Test plan: Check FR for 2 BFs.
- Number of cables: Ask Tomaru on cryo-payload.
Type-A Meeting on 2016/6/14
2016/6/14 13:00 - 15:00 @ Room 210
Participants: Takahashi, Ishizaki, Sato, Okutomi
Minutes
- 0-1 Assembly model (Ishizaki)
- Step: From EQ stop, next with chamber.
- Problem: Conversion to Simulink was ok. The structure of control has a problem in Matlab. Reconstructing now.
- Space: Make working space in the 20m lab.
- Design: 5 blades are used for 200kg load.
- Device: Asking design of LVDT-Act. to VIRGO. The device is located at the center of mass.
- Structure analysis: Two cases were calculated. Share stress was 1/6 of limit, and principal stress was 1/7 of limit respectively in the maximum case.
- Modeling: Making with consideration of procedure and tools.
- Frame lock: Maximum stress was 160MPa with thickness of 30mm (limit 180MPa).
- Position: Inner side of the stage. Need to addtional machining to the EQ stop plate.
- Electronics: Circuit is simple in the test (handmade).
- Condition: 25cm mirror, alignment by moving mass. Make a cartoon.
- Actuation: Length control is necessary? Check PZT actuator.
- Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs.
Next meeting: 2016/6/21 13:00