Differences between revisions 79 and 83 (spanning 4 versions)
Revision 79 as of 2016-10-31 19:26:29
Size: 3096
Editor: KokiOkutomi
Comment:
Revision 83 as of 2016-10-31 19:51:55
Size: 3796
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Information of the Type-A Seismic Attenuation System (SAS).
This page wants information about not only room-temperature parts but also cryogenic vibration isolation system.
Line 10: Line 13:
  * Cryostat

=== Room-temperature parts ===
Line 24: Line 30:
=== Cryogenics ===
 * Cryo-Payload assy
 * Platform
 * Marionette
 * Marionette Recoil Mass
 * Intermediate Mass
 * Intermediate Recoil Mass
 * Sapphire Mirror (Test Mass)
 * Recoil Mass
 * Heat link
  * Heat link suspension
Line 28: Line 46:
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=410|Initial concept]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Installation procedure of Type-A system]]
Line 48: Line 67:
 * Cabling

Information of the Type-A Seismic Attenuation System (SAS). This page wants information about not only room-temperature parts but also cryogenic vibration isolation system.

TypeAdesign

Drawings

  • Type-A SAS whole assy
  • Vacuum chamber

Room-temperature parts

Cryogenics

  • Cryo-Payload assy
  • Platform
  • Marionette
  • Marionette Recoil Mass
  • Intermediate Mass
  • Intermediate Recoil Mass
  • Sapphire Mirror (Test Mass)
  • Recoil Mass
  • Heat link
    • Heat link suspension

Documents

Reports

Installation Procedure

Measurement and Analysis

Electronics

List of drivers for VIS


Schedule

Task list

Meeting

See also

KAGRA/Subgroups/VIS/TypeA (last edited 2021-11-02 17:29:27 by naohisa.sato)