Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
||Task||August 27-31||September 3-7||September 10-13||September 14|| | ||Task||August 27-31||September 3-7||September 10-13||September 14|| Reference || Comments || |
Line 14: | Line 14: |
||<|2> ADC||<|2> D1100621||ADC#0||BS in general|| - || |
Here we will clarify the steps to follow to complete the characterization of the Type B suspensions:
SR3
Task |
August 27-31 |
September 3-7 |
September 10-13 |
September 14 |
Reference |
Comments |
IM Local damping |
- |
- |
- |
- |
||
GAS Local damping |
- |
- |
- |
- |
||
TM Local damping |
- |
- |
- |
- |
||
IM-TM Hierarchical damping |
- |
- |
- |
- |
||
IP Blending filter |
- |
- |
- |
- |
||
IP Local damping |
- |
- |
- |
- |
||
IM Diagonalization |
- |
- |
- |
- |
||
IP Diagonalization |
- |
- |
- |
- |