Differences between revisions 1 and 11 (spanning 10 versions)
Revision 1 as of 2018-02-07 15:54:53
Size: 1800
Editor: MarkBarton
Comment:
Revision 11 as of 2018-02-27 11:27:32
Size: 3743
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
* Build four geophone assemblies (Okutomi-kun has built five):
 * Have most parts:
  * Four sets of canister parts (body, neck, head).
  * Five geophones.
  * Three circuit boards - probably more exist but need to find.
  * 20 x M8*35 (need 4*16=64)
  * 35 x M8*30 (need 4*8=32)
  * 4 x Viton disks (need 4? or 8?)
  * 123 M8 washers (need 4*24=96)
== Possible schedule of selected tasks from below ==
 * Week of 3/5
  * Finish any remaining SR2 SF stuff. (Enzo+2)
  * Get SRM mushroom installed (Hirata-san, Kimura-san, Sawada-san)
  * BF filter rebuild (Hirata-san+1)
   * Move filter table into SRM area.
   * Get additional heavy table.
   * Disassemble two filters
   
 * Week of 3/12
  * Rack work (Enzo+1)
   * Find boxes for SR3 and SRM at Mozumi
   * Add boxes to SR3 and SRM racks
   * Do SR3 and SRM in-rack cables and labeling
   * Do SR3 in-air cables.
  * BF filter rebuild continued (Hirata-san+1)
   * Characterize 10 blades
   * Choose two matched sets
   * Rebuild two filters
    
 * Week of 3/19 (Mitaka)
  * Make two sets of IM OSEMs
  * Make last in-air pico adapter cable
  * Make three in-air stepper splitter cables for SR2, SR3 and SRM.
  * Set up Dummy BS prism removal.
Line 13: Line 29:
* Set up SR3 and SRM racks.
 * Miyakawa-san gave us an empty rack for SR3 => can add boxes and do internal cabling and labels.
 * SR3 rack position is decided (on -X,+Y corner of SR3 cleanbooth) => can do in-air cabling from rack to assembly frame.
 * Miyakawa-san will soon give us an empty rack for SRM and decide position.
 * Week of 3/26
  * SF Setup, Test
   * Set up SR3 assembly frame, weights.
   * Bring in remaining two SFs.
   * Remeasure load capacity, check for tilted keystone.
   * Install Cu segments on cap.
   * Wire and test LVDT.
Line 18: Line 37:
* Disassemble broken top filters
 * Set up heavy table in SRM area (first floor, -X side).
 * Find jig and blade tensioning screw.
 * Remove blades from #3 (in SRM area).
 * Store #3 in box.
 * Remove floor panel in SRM second floor.
 * Crane #1 (in SR3 area) to SRM area.
 * Remove blades from #1.
 * Put test weights on table.
== Things we're ''not'' doing in March because we'd have to bump something else ==
 * Geophones
 * Top filter disassembly
 * SF inspection/test/setup
 * BF rebuild
Line 28: Line 43:
* BF rebuild.
 * Move BS Test Hang BF to tent and remove blades. (These blades are for BS-BF and will not be used again.)
 * Find SR-BF blades that were removed to free up a BF base for the BS Final Hang.
 * Move BF with tilted keystone to tent and remove blades.
 * Characterize all SR-BF blades and choose two similar groups.
 * Rebuild two filters.
== Tasks that we have the necessary items to do in March ==
Line 35: Line 45:
* Etc
 * Make one set of in-air pico splitter cables (triple and double) for SRM.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM.
 * Soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
 * Make box of stuff to send to Mitaka
  * OSEM coils and connectors for assembly.
  * Pico in-air adapter parts.
  * BS soaking cup.
  * Anti-feedthrough adapter parts.
  * Geophone parts?
  *
 * Build four geophone assemblies (Okutomi-kun has built five):
  * Have most parts:
   * Four sets of canister parts (body, neck, head).
   * Five geophones.
   * Three circuit boards - probably more exist but need to find.
   * 20 x M8*35 (need 4*16=64)
   * 35 x M8*30 (need 4*8=32)
   * 4 x Viton disks (need 4? or 8?)
   * 123 M8 washers (need 4*24=96)
Line 40: Line 62:
* Stuff to have done by other teams
 * Add mushroom top to SRM tank.
 * Put up safety bars
 * Assemble more OSEMs.
  * Have 6 wound coils and connectors at Kamioka (one set, for SR3).
  * Have 6 more at Mitaka.
Line 44: Line 66:
*  * Set up SR3 and SRM racks.
  * Miyakawa-san gave us an empty rack for SR3 => can add boxes and do internal cabling and labels.
  * SR3 rack position is decided (on -X,+Y corner of SR3 cleanbooth) => can do in-air cabling from rack to assembly frame.
  * Miyakawa-san will soon give us an empty rack for SRM and decide position => will be able to do set-up.

 * Disassemble broken top filters
  * Set up heavy table in SRM area (first floor, -X side).
  * Find jig and blade tensioning screw.
  * Remove blades from #3 (in SRM area).
  * Store #3 in box.
  * Remove floor panel in SRM second floor.
  * Crane #1 (in SR3 area) to SRM area.
  * Remove blades from #1.
  * Put test weights on table.

 * BF rebuild - Hirata-san + 1
  * Move BS Test Hang BF to tent and remove blades. (These blades are for BS-BF and will not be used again.)
  * Find SR-BF blades that were removed to free up a BF base for the BS Final Hang.
  * Move BF with tilted keystone to tent and remove blades.
  * Characterize all SR-BF blades and choose two similar groups.
  * Rebuild two filters.

 * Etc
  * Move all SFs to cleanbooth and inspect for keystone tilt and/or other issues.
  * Make one set of in-air pico splitter cables (triple and double) for SRM.
  * Make three in-air stepper splitter cables for SR2, SR3 and SRM.
  * Soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  * Do buoyancy calculation (see LIGO-T1100616).
  * Set up SR2 Guardian.
  * Install damping filters for SR2.

 * Stuff to have done by other teams
  * Add mushroom top to SRM tank.
  * Put up safety bars

Stuff for Type B to do in March 2018 while waiting for deliveries

Possible schedule of selected tasks from below

  • Week of 3/5
    • Finish any remaining SR2 SF stuff. (Enzo+2)
    • Get SRM mushroom installed (Hirata-san, Kimura-san, Sawada-san)
    • BF filter rebuild (Hirata-san+1)
      • Move filter table into SRM area.
      • Get additional heavy table.
      • Disassemble two filters
  • Week of 3/12
    • Rack work (Enzo+1)
      • Find boxes for SR3 and SRM at Mozumi
      • Add boxes to SR3 and SRM racks
      • Do SR3 and SRM in-rack cables and labeling
      • Do SR3 in-air cables.
    • BF filter rebuild continued (Hirata-san+1)
      • Characterize 10 blades
      • Choose two matched sets
      • Rebuild two filters
  • Week of 3/19 (Mitaka)
    • Make two sets of IM OSEMs
    • Make last in-air pico adapter cable
    • Make three in-air stepper splitter cables for SR2, SR3 and SRM.
    • Set up Dummy BS prism removal.
  • Week of 3/26
    • SF Setup, Test
      • Set up SR3 assembly frame, weights.
      • Bring in remaining two SFs.
      • Remeasure load capacity, check for tilted keystone.
      • Install Cu segments on cap.
      • Wire and test LVDT.

Things we're ''not'' doing in March because we'd have to bump something else

  • Geophones
  • Top filter disassembly
  • SF inspection/test/setup
  • BF rebuild

Tasks that we have the necessary items to do in March

  • Make box of stuff to send to Mitaka
    • OSEM coils and connectors for assembly.
    • Pico in-air adapter parts.
    • BS soaking cup.
    • Anti-feedthrough adapter parts.
    • Geophone parts?
  • Build four geophone assemblies (Okutomi-kun has built five):
    • Have most parts:
      • Four sets of canister parts (body, neck, head).
      • Five geophones.
      • Three circuit boards - probably more exist but need to find.
      • 20 x M8*35 (need 4*16=64)
      • 35 x M8*30 (need 4*8=32)
      • 4 x Viton disks (need 4? or 8?)
      • 123 M8 washers (need 4*24=96)
  • Assemble more OSEMs.
    • Have 6 wound coils and connectors at Kamioka (one set, for SR3).
    • Have 6 more at Mitaka.
  • Set up SR3 and SRM racks.
    • Miyakawa-san gave us an empty rack for SR3 => can add boxes and do internal cabling and labels.

    • SR3 rack position is decided (on -X,+Y corner of SR3 cleanbooth) => can do in-air cabling from rack to assembly frame.

    • Miyakawa-san will soon give us an empty rack for SRM and decide position => will be able to do set-up.

  • Disassemble broken top filters
    • Set up heavy table in SRM area (first floor, -X side).
    • Find jig and blade tensioning screw.
    • Remove blades from #3 (in SRM area).
    • Store #3 in box.
    • Remove floor panel in SRM second floor.
    • Crane #1 (in SR3 area) to SRM area.
    • Remove blades from #1.
    • Put test weights on table.
  • BF rebuild - Hirata-san + 1
    • Move BS Test Hang BF to tent and remove blades. (These blades are for BS-BF and will not be used again.)
    • Find SR-BF blades that were removed to free up a BF base for the BS Final Hang.
    • Move BF with tilted keystone to tent and remove blades.
    • Characterize all SR-BF blades and choose two similar groups.
    • Rebuild two filters.
  • Etc
    • Move all SFs to cleanbooth and inspect for keystone tilt and/or other issues.
    • Make one set of in-air pico splitter cables (triple and double) for SRM.
    • Make three in-air stepper splitter cables for SR2, SR3 and SRM.
    • Soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
    • Do buoyancy calculation (see LIGO-T1100616).
    • Set up SR2 Guardian.
    • Install damping filters for SR2.
  • Stuff to have done by other teams
    • Add mushroom top to SRM tank.
    • Put up safety bars

KAGRA/Subgroups/VIS/TypeB/March2018 (last edited 2018-04-20 15:24:15 by YoshinoriFujii)