Line 3: Line 3:
 * Possible schedule
  * Week of 3/5
   * Get SRM mushroom installed
   * Set up for BF filter rebuild, characterize blades
  * Week of 3/12
  * Week of 3/19
  * Week of 3/26
   * Hirata-san, Enzo, Kozu, +1 install damper rings in tanks.
== Possible schedule of selected tasks from below ==
 * Week of 3/5
  * Finish any remaining SR2 SF stuff. (Enzo+2)
  * Get SRM mushroom installed (Hirata-san, Kimura-san, Sawada-san)
  * BF filter rebuild (Hirata-san+1)
   * Move filter table into SRM area.
   * Get additional heavy table.
   * Disassemble two filters
   
 * Week of 3/12
  * Rack work (Enzo+1)
   * Find boxes for SR3 and SRM at Mozumi
   * Add boxes to SR3 and SRM racks
   * Do SR3 and SRM in-rack cables and labeling
   * Do SR3 in-air cables.
  * BF filter rebuild continued (Hirata-san+1)
   * Characterize 10 blades
   * Choose two matched sets
   * Rebuild two filters
    
 * Week of 3/19 (Mitaka)
  * Make two sets of IM OSEMs
  * Make in-air pico adapter cable
  * Set up Dummy BS prism removal.

 * Week of 3/26
  * SF Setup, Test
   * Set up SR3 assembly frame, weights.
   * Bring in remaining two SFs.
   * Remeasure load capacity, check for tilted keystone.
   * Install Cu segments on cap.
   * Wire and test LVDT.

== Tasks that we have the necessary items to do in March ==

Stuff for Type B to do in March 2018 while waiting for deliveries

Possible schedule of selected tasks from below

  • Week of 3/5
    • Finish any remaining SR2 SF stuff. (Enzo+2)
    • Get SRM mushroom installed (Hirata-san, Kimura-san, Sawada-san)
    • BF filter rebuild (Hirata-san+1)
      • Move filter table into SRM area.
      • Get additional heavy table.
      • Disassemble two filters
  • Week of 3/12
    • Rack work (Enzo+1)
      • Find boxes for SR3 and SRM at Mozumi
      • Add boxes to SR3 and SRM racks
      • Do SR3 and SRM in-rack cables and labeling
      • Do SR3 in-air cables.
    • BF filter rebuild continued (Hirata-san+1)
      • Characterize 10 blades
      • Choose two matched sets
      • Rebuild two filters
  • Week of 3/19 (Mitaka)
    • Make two sets of IM OSEMs
    • Make in-air pico adapter cable
    • Set up Dummy BS prism removal.
  • Week of 3/26
    • SF Setup, Test
      • Set up SR3 assembly frame, weights.
      • Bring in remaining two SFs.
      • Remeasure load capacity, check for tilted keystone.
      • Install Cu segments on cap.
      • Wire and test LVDT.

Tasks that we have the necessary items to do in March

  • Make box of stuff to send to Mitaka
    • OSEM coils and connectors for assembly.
    • Pico in-air adapter parts.
    • BS soaking cup.
    • Anti-feedthrough adapter parts.
    • Geophone parts?
  • Build four geophone assemblies (Okutomi-kun has built five):
    • Have most parts:
      • Four sets of canister parts (body, neck, head).
      • Five geophones.
      • Three circuit boards - probably more exist but need to find.
      • 20 x M8*35 (need 4*16=64)
      • 35 x M8*30 (need 4*8=32)
      • 4 x Viton disks (need 4? or 8?)
      • 123 M8 washers (need 4*24=96)
  • Assemble more OSEMs.
    • Have 6 wound coils and connectors at Kamioka (one set, for SR3).
    • Have 6 more at Mitaka.
  • Set up SR3 and SRM racks.
    • Miyakawa-san gave us an empty rack for SR3 => can add boxes and do internal cabling and labels.

    • SR3 rack position is decided (on -X,+Y corner of SR3 cleanbooth) => can do in-air cabling from rack to assembly frame.

    • Miyakawa-san will soon give us an empty rack for SRM and decide position => will be able to do set-up.

  • Disassemble broken top filters
    • Set up heavy table in SRM area (first floor, -X side).
    • Find jig and blade tensioning screw.
    • Remove blades from #3 (in SRM area).
    • Store #3 in box.
    • Remove floor panel in SRM second floor.
    • Crane #1 (in SR3 area) to SRM area.
    • Remove blades from #1.
    • Put test weights on table.
  • BF rebuild - Hirata-san + 1
    • Move BS Test Hang BF to tent and remove blades. (These blades are for BS-BF and will not be used again.)
    • Find SR-BF blades that were removed to free up a BF base for the BS Final Hang.
    • Move BF with tilted keystone to tent and remove blades.
    • Characterize all SR-BF blades and choose two similar groups.
    • Rebuild two filters.
  • Etc
    • Move all SFs to cleanbooth and inspect for keystone tilt and/or other issues.
    • Make one set of in-air pico splitter cables (triple and double) for SRM.
    • Make three in-air stepper splitter cables for SR2, SR3 and SRM.
    • Soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
    • Do buoyancy calculation (see LIGO-T1100616).
    • Set up SR2 Guardian.
    • Install damping filters for SR2.
  • Stuff to have done by other teams
    • Add mushroom top to SRM tank.
    • Put up safety bars