  * Hirata-san finished the design of the trolley system (including adapter plates for the mirror box).
  * Mirapro reported that rails for the trolley system had a long lead time, so we decided to order them separately.
  * IM and BS flags were ordered.
  * Tatsumi-san ordered the prism gluing jig parts for the mirror box.
  * Hirata-san measured another SF.
  * Mark worked on the assembly procedure.
  * Fabian worked on the Mathematica/Matlab model of the BS.
  * Flags and metal prisms ordered; expected 5/31.
  * Updated drawing for IM-RM safety bar.
  * New drawings for crane adapter, lower breadboard blade module (with cable clamps).

Scraps of text for incorporation in the VIS Meeting Minutes

KAGRA/Subgroups/VIS/MeetingNAOJ

  • Type B
    • Flags and metal prisms ordered; expected 5/31.
    • Updated drawing for IM-RM safety bar.
    • New drawings for crane adapter, lower breadboard blade module (with cable clamps).