* Hirata-san finished the design of the trolley system (including adapter plates for the mirror box). * Mirapro reported that rails for the trolley system had a long lead time, so we decided to order them separately. * IM and BS flags were ordered. * Tatsumi-san ordered the prism gluing jig parts for the mirror box. * Hirata-san measured another SF. * Mark worked on the assembly procedure. * Fabian worked on the Mathematica/Matlab model of the BS. |
* Flags and metal prisms ordered; expected 5/31. * Updated drawing for IM-RM safety bar. * New drawings for crane adapter, lower breadboard blade module (with cable clamps). |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Type B
- Flags and metal prisms ordered; expected 5/31.
- Updated drawing for IM-RM safety bar.
- New drawings for crane adapter, lower breadboard blade module (with cable clamps).