* Activity report for week of 12/19 * Mark and Fabian checked Hirata-san's drawings and parts/fastener lists for the SRM/PRM order. * [[KAGRASubgroupsVISVISMinutes20161216#BFIssue|BF issue]] * Aso-san and Mark decided to have the BS bottom filter |
* Hirata-san: * Updated the 3D assembly model for BS (among other issues, it turned out that parts were not correctly mated near where the suspension sits on the hydraulic jacks in the tank). * Liaised with IJECT. * Made an inventory for Type B (BS and SR). * Packed and shipped second winch to Kamioka. * Packed some jigs for adjusting BF blades. * Attended NINS information security seminar. * Attended the public hearing for the Opt-IR Research Division Chief Election. * Mark and Fabian at Kamioka (plus Enzo for 2 days): * Finished rebalance of IM * Reinstalled IRM, adjusted OSEMs * Replaced broken Type 3 cable on IM-H1 OSEM. * Fixed issues with k1visbs real-time model. * Started TFs from IRM OSEMs to IRM and IM OSEMs. * Mark, Fabian and Enzo * |
Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Hirata-san:
- Updated the 3D assembly model for BS (among other issues, it turned out that parts were not correctly mated near where the suspension sits on the hydraulic jacks in the tank).
- Liaised with IJECT.
- Made an inventory for Type B (BS and SR).
- Packed and shipped second winch to Kamioka.
- Packed some jigs for adjusting BF blades.
- Attended NINS information security seminar.
- Attended the public hearing for the Opt-IR Research Division Chief Election.
- Mark and Fabian at Kamioka (plus Enzo for 2 days):
- Finished rebalance of IM
- Reinstalled IRM, adjusted OSEMs
- Replaced broken Type 3 cable on IM-H1 OSEM.
- Fixed issues with k1visbs real-time model.
- Started TFs from IRM OSEMs to IRM and IM OSEMs.
- Mark, Fabian and Enzo